首页> 外文会议>NAWTEC20;ASME annual North American waste to energy conference >COMPARISON OF ENVIRONMENTAL PERFORMANCE EXPECTATIONS: GASIFICATION VERSUS MASS-BURN WTE FACILITIES CURRENTLY UNDER CONSTRUCTION IN NORTH AMERICA
【24h】

COMPARISON OF ENVIRONMENTAL PERFORMANCE EXPECTATIONS: GASIFICATION VERSUS MASS-BURN WTE FACILITIES CURRENTLY UNDER CONSTRUCTION IN NORTH AMERICA

机译:环境绩效预期的比较:北美目前正在建设的气化与大量燃烧的WTE设施

获取原文

摘要

In recent years, factors including limited landfill capacity, increasing costs of fossil fuels, and increased pressure to actively recover value from waste in the form of materials and energy have encouraged municipalities throughout North America to advance waste management strategies that utilize waste-to-energy (WTE) technologies as an alternative to landfilling. Currently, utilization of alternative conversion technologies, including gasification, is limited to small-scale or pilot municipal solid waste (MSW) to energy facilities in North America. Though limited history of environmental performance when using MSW as a primary feedstock has delayed public acceptance of facility proposals, municipalities are now moving forward with alternative conversion technology applications. In Florida, two entities have received permits from the Department of Environmental Protection to proceed with construction of gasification facilities - Geoplasma, Inc. in St. Lucie County, and INEOS New Planet BioEnergy in Vero Beach. In Edmonton, Alberta, Canada, Enerkem GreenField Alberta Biofuels has received a permit from Alberta Environment to begin construction of a gasification facility that will produce bioethanol from post-recycled MSW. Since 1996, no new greenfield MSW-processing mass burn facility has been constructed in the U.S., though facilities in Hillsborough County, FL; Lee County, FL; and Olmstead County, MN have undergone expansions, and in Honolulu, FL, a 900 TPD unit is currently under construction. In recent years, two municipalities have received permits to proceed with construction of mass burn WTE facilities and have made significant progress toward implementation: The municipalities of Durham and York, Ontario, Canada and The Solid Waste Authority of Palm Beach County, Florida. This paper will provide a direct comparison of the expected environmental performance of the recently permitted gasification facilities to the expected environmental performance of the recently permitted mass burn WTE facilities, as established by permit applications and emissions modeling studies. Comparison of emissions of particulate matter, sulfur dioxide, nitrogen oxides, carbon monoxide, volatile organic compounds, and hydrogen chloride will be performed on the basis of one ton of feedstock processed. Emission of these pollutants at the recently permitted facilities discussed above will be contrasted with emissions experienced at currently operating WTE facilities within North America.
机译:近年来,包括垃圾填埋场容量有限,化石燃料成本增加以及以材料和能源形式积极地从废物中回收价值的压力不断增加等因素,促使整个北美地区的市政当局推进利用废物转化为能源的废物管理策略。 (WTE)技术替代垃圾填埋场。当前,包括气化在内的替代转化技术的利用仅限于北美能源设施的小规模或试点城市固体废物(MSW)。尽管使用城市固体废弃物作为主要原料时环境绩效的历史有限,已延迟了公众对设施建议的接受,但市政当局现在正朝着替代转化技术应用的方向前进。在佛罗里达州,两个实体已获得环境保护部的许可,可以继续建设气化设施-圣露西县的Geoplasma,Inc.和维罗海滩的INEOS New Planet BioEnergy。在加拿大艾伯塔省埃德蒙顿,Enerkem GreenField艾伯塔省生物燃料公司已获得艾伯塔省环境局的许可,开始建设一个气化设施,该设施将利用回收后的城市固体废弃物生产生物乙醇。自1996年以来,尽管位于佛罗里达州希尔斯伯勒县的工厂尚未在美国建造任何新的城市生活垃圾处理大规模燃烧设施。佛罗里达州利县;和明尼苏达州奥姆斯特德县已经进行了扩建,在佛罗里达州火奴鲁鲁,目前正在建设一个900 TPD的装置。近年来,两个城市已获得许可进行大规模燃烧WTE设施的建设,并在实施方面取得了重大进展:加拿大安大略省达勒姆市和约克市以及佛罗里达州棕榈滩县固体废物管理局。本文将根据许可申请和排放模型研究,将最近获得许可的气化设施的预期环境绩效与最近获得许可的大规模燃烧WTE设施的预期环境绩效进行直接比较。颗粒物,二氧化硫,氮氧化物,一氧化碳,挥发性有机化合物和氯化氢的排放量的比较将基于处理的一吨原料进行。上面讨论的最近允许的设施中这些污染物的排放将与北美目前运行的WTE设施中的排放形成对比。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号