Wallaby Deeps - From the Optimal Opportunity to Reality

机译:袋鼠之深-从最佳机会到现实

获取原文
获取原文并翻译 | 示例

摘要

The Barrick Gold Granny Smith underground operation located at the Wallaby deposit is currently in a transition period from a near surface operation in ramp up mode to a fully operational deep mining operation with annual production exceeding l Mt/a. A key element in this process has been the project execution of the Wallaby Deeps project from initial scoping study in 2007 to the major production component of the Wallaby operation by 2013. The Wallaby Deeps project serves as an example of how an ongoing detailed study program can be integrated into a day to day mining operation assessing risk and mining application in a perceived challenging narrow vein geotechnical environment prior to mining. A detailed study phase to feasibility level is carried out prior to the mining each zone of Wallaby with mining approval only granted on study completion with full justification. A central element in this process is an optimisation study that utilising the Mineable Shape Optimiser (MSO) and Schedule Optimisation Tool (SOT) software tools developed by AMIRA Ltd PRIMO research project is used to carry out an NPV value based option study. This optimisation process being then tempered to reality by a predefined practicality assessment process utilising extensive peer review by operational and study team members as well as industry experts. Other challenges facing the Wallaby Deeps project include the requirement to maintain the ramp up production profile to full production by 2012 without disruption but with pressures of an ongoing geological resource to reserve conversion program essential for the study process and mining approvals and also development rate achievement. To date these challenges are being met with integrated planning and the value of the study program itself. Production in 2012 year to date is well on the way to annual production rate exceeding 1 Mt/a.
机译:位于Wallaby矿床的Barrick Gold Granny Smith地下作业目前正处于从以加速模式的近地表作业到年产量超过1 Mt / a的全面作业的深矿作业的过渡时期。此过程的关键要素是Wallaby Deeps项目的项目执行,从2007年的初步范围研究到2013年Wallaby业务的主要生产组成部分。WallabbyDeeps项目是如何进行正在进行的详细研究计划的一个示例在采矿之前,应将其整合到日常采矿作业中,以评估风险和狭窄的岩土岩土环境中的采矿应用。在对Wallaby的每个区域进行开采之前,都要进行详细的研究阶段,达到可行性水平,并且只有在研究完成且有充分理由的情况下才批准开采许可。此过程的中心要素是优化研究,该研究利用AMIRA Ltd PRIMO研究项目开发的Mineable Shape Optimiser(MSO)和Schedule Optimization Tool(SOT)软件工具来进行基于NPV价值的期权研究。然后,通过操作和研究团队成员以及行业专家进行的广泛同行评审,通过预定义的实用性评估过程将此优化过程变为现实。 Wallaby Deeps项目面临的其他挑战包括要求在2012年之前保持产量增长到满负荷生产,而不会受到干扰,但仍面临着不断地质资源的压力,以保留对研究过程和采矿审批以及开发速度至关重要的转换计划。迄今为止,综合计划和研究计划本身的价值正在解决这些挑战。截止目前,2012年的产量正以每年超过1 Mt / a的速度增长。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号