首页> 外文会议>Moving technology – maintaining competence >Management of Change - The Transformation of UK CoalProject 105
【24h】

Management of Change - The Transformation of UK CoalProject 105

机译:变革管理-英国CoalProject 105的转型

获取原文
获取原文并翻译 | 示例

摘要

In the UK during the 1990s the energy companies had developed a policyrnof ‘Dash for Gas’, building large natural gas power stations to producernmore than 30 per cent of the UK’s electricity demand. The price ofrnimported thermal coal was dropping and the electricity generators werernputting pressure on the UK coal producers to produce coal at a reducedrncost. Imported coal from Columbia, South Africa, America andrnAustralasia had increased their market share in thermal coal sales to overrn50 per cent of a 55 Mtpa market. The pressure on the UK coal industry tornreduce costs and improve productivity levels from an ever decreasingrnresource was high. Companies were benchmarking their operations on thernimported coal producers and had to realign their organisations,rnproductivity levels and costs to world best practice, not just technically,rnbut in world class organisational management techniques.
机译:在1990年代的英国,能源公司开发了一个名为“ Dash for Gas”的政策,建造了大型天然气发电站,以生产英国30%以上的电力需求。进口动力煤的价格正在下降,发电机给英国煤炭生产商带来了以降低成本生产煤炭的压力。从哥伦比亚,南非,美国和澳大利亚进口的煤炭已将其在动力煤销售中的市场份额提高到55 Mtpa市场的50%以上。由于不断减少的资源,英国煤炭行业面临着降低成本,提高生产率的压力。公司正在对进口煤炭生产商的运营进行基准测试,并且不得不将其组织,生产力水平和成本调整为世界最佳实践,而不仅仅是技术上的,而是世界一流的组织管理技术。

著录项

  • 来源
  • 会议地点 Brisbane(AU);Brisbane(AU)
  • 作者

    K J Irving;

  • 作者单位

    Group Manager Coal,Snowden Mining Industry Consultants Pty Ltd,rnLevel 5, 82 Eagle Street, Brisbane Qld 4000 Email:kirving@snowdenau.com;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号