首页> 外文会议>Monitoring, simulation, prevention and remediation of dense and debris flows IV >Protection against debris flows with 13 flexible barriers in the Milibach River (Canton Berne, Switzerland) and first event analysis
【24h】

Protection against debris flows with 13 flexible barriers in the Milibach River (Canton Berne, Switzerland) and first event analysis

机译:利用米利巴赫河(瑞士伯恩州)中的13个柔性屏障防止泥石流和首次​​事件分析

获取原文
获取原文并翻译 | 示例

摘要

The villages Hasliberg Reuti and Meiringen in Switzerland were affected by flood and debris flow events resulting from unusually large rainfall in August 2005. The endangerment of these settlements was not consistent with the existing damage potential and thus the need for action was very great. Due to the difficult natural basic conditions in the catchment area with permanent sliding of alenien schist material with very low friction coefficient if infiltrated by water, conventional preventive stiff measures could not be used there because of foundation problems. A promising new solution was selected with 13 flexible ringnet barriers providing a total retention capacity of 12,000 m~3. Because of little experience with this new type of protection measure in dimensioning, well-founded investigations with extensive laboratory tests and numerical simulations had to be undertaken. These analyses gave the maximal possible certainty to engineers and authorities that these measures will afford adequate protection and keep the residual risk as low as possible. Close co-operation between the scientific team of the WSL, the industrial partner and the cantonal authority during the dimensioning process led to a consistent and technically plausible solution. On 10th October 2011, another big storm occurred in the Hasliberg area with a 100 year flood declared from the Federal Office for the Environment (FOEN). The rainfall in the Berner Alps summarized within 12 hours up to 80 mm plus the stored water by the snow fall of up to 70 cm resulted in flooding of mountain rivers, slope failures and landslides. Around 2,000 m3 of material were mobilized in the catchment area of Hasliberg by a shallow landslide flowing into the torrent. One of the 13 barriers was filled completely and two others were half filled. The new protection measure installed in 2008 predicts a bigger debris flow event by already stopping the material in the catchment area and avoiding further erosion of the flow process river upstream which happened in August 2005.
机译:瑞士的Hasliberg Reuti和Meiringen村受到2005年8月异常大雨造成的洪水和泥石流事件的影响。这些定居点的危害与现有的破坏潜力不符,因此,采取行动的必要性非常高。由于集水区的自然自然条件艰苦,如果被水渗透,具有低摩擦系数的片状片岩材料会永久滑动,由于地基问题,那里无法采用常规的预防性刚性措施。选择了一种有前途的新解决方案,该解决方案具有13个柔性环网屏障,提供的总保留容量为12,000 m〜3。由于在这种新型保护措施的尺寸设计方面经验很少,因此必须进行充分的研究,包括广泛的实验室测试和数值模拟。这些分析为工程师和主管部门提供了最大可能的确定性,即这些措施将提供足够的保护并尽可能降低残留风险。在选型过程中,WSL的科学团队,行业合作伙伴和州政府之间的密切合作导致了一致且技术上可行的解决方案。 2011年10月10日,哈斯利贝格(Hasliberg)地区又发生了一场大风暴,联邦环境办公室(FOEN)宣布发生了100年的洪水。伯纳阿尔卑斯山的降雨在12个小时内汇总到了80毫米,再加上长达70厘米的降雪积蓄的水导致了山区河流的洪水,斜坡破坏和山体滑坡。流入山洪的浅层滑坡在哈斯利贝格集水区调集了约2,000 m3的材料。 13个障碍之一已被完全填满,另外两个障碍已被一半填满。 2008年安装的新保护措施通过已经在集水区停止了物料并避免了2005年8月发生的上游流程河的进一步侵蚀来预测更大的泥石流事件。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号