The Excavation and Treatment of Complex Karst Foundation of Aikou Reservoir Dam

机译:爱口水库大坝复杂岩溶基础开挖与处理。

获取原文
获取原文并翻译 | 示例

摘要

The geological condition of Aikou reservoir dam is extremely complex and hence causes great difficulties for its excavation and treatment.Experiences of many experts specialized in karst geology and dam foundation treatment have been consulted to solve the worldwide problems that are caused by dam sites in limestone terrains.Its bedrock has intense limestone development. The linear corrosion rate of limestone amounts to 23.23%.It is found from primary excavation that dam foundation pit has severely undulation and its surface does not show traditional pattern.Based on detail geological investigation,dam foundation region is divided into three zones according to corrosion rate of limestone,i.e.Zone I of corrosion rock mass,Zone II of residual rock mass,Zone III of corrosion field with much silt fills.Dam foundation pit is divided into two areas of A and B for the design of excavation and treatment schemes in accord with specific requirement.Schemes of excavation and consolidation grouting for these two areas are introduced herein. Acoustic wave detection method is used to verify the grouting quality in Area A.Ground penetrating radar is used to investigate karst distribution in Area B in order to determine whether further treatment would be needed. At present,dam foundation excavation has been completed and passed through inspection and acceptance.Grouting tests have also been finished.Foundation grouting work is being carried out according to construction design.
机译:爱口水库大坝的地质条件极为复杂,对其开挖和处理造成很大困难。咨询了众多岩溶地质和大坝基础处理专家的经验,解决了石灰岩地形坝址引起的全球性问题。它的基岩有强烈的石灰岩发育。石灰石的线腐蚀率达23.23%。从一次开挖中发现,坝基坑严重起伏,表面没有传统花纹。根据详细的地质调查,根据腐蚀情况,坝基区域分为三个区域。石灰石的速率,即腐蚀岩体的I区,剩余岩体的II区,充满粉砂的腐蚀场III区。大坝基坑分为A和B两个区域,用于开挖和处理方案的设计。在此介绍了这两个区域的开挖和固结灌浆方案。采用声波检测方法验证了A区的灌浆质量。探地雷达用于研究B区的岩溶分布,以确定是否需要进一步处理。目前,大坝基础开挖已经完成,并通过了验收。灌浆试验也已完成。基础注浆工作正在按施工设计进行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号