首页> 外文会议>Modern rockfill dams-2009 >Construction of the Nam Ngum 2 CFRD
【24h】

Construction of the Nam Ngum 2 CFRD

机译:Nam Ngum 2 CFRD的建设

获取原文
获取原文并翻译 | 示例

摘要

The Nam Ngum 2 Hydroelectric Power Project (NN2 HPP) located approximately 90 km.north of Vientiane,Lao PDR. The dam is concrete face rockfill dam (CFRD) with height of 182 m. The Construction schedule of the project was limited concession period. The Engineering and Construction are very challenge to complete the project in time. The performance of rockfill and face slab is importance for CFRD,which can ensure by strictly control the quality of rockfill.
机译:Nam Ngum 2水电项目(NN2 HPP)位于老挝万象北部约90公里处。该坝为高182 m的混凝土面板堆石坝(CFRD)。该项目的建设进度有限。工程和施工对于及时完成项目非常有挑战。堆石和面板的性能对CFRD很重要,可以通过严格控制堆石的质量来保证。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号