Numerical Analysis of Static and Dynamic Behavior of Jianke Core-Walled Rockfill Dam

机译:剑科心墙堆石坝静动力特性数值分析。

获取原文
获取原文并翻译 | 示例

摘要

Jianke hydroelectric power station is in Songpan county of Aba Tibetan and Qiang Autonomous Prefecture in Sichuan Province,which belongs to mountain and ravine region of southeastern West Sichuan Plateau and northwestern Sichuan Basis. As the principal reservoir,Jianke is the first step of "One-reservoir and three-cascade" exploitation of hydropower in the Maoergai River. The project area locates on the northeast of Sichuan-Qinghai block,where the most important structure is Minjiang fault zone and Longmenshan fault zone and earthquake activity is frequent. Taking Jianke core-walled rockfill dam as study object,the static and dynamic behavior of the dam is analyzed based on 3D nonlinear FEM. The results show that the restraint function of bank slope is intense and the spatial effect is remarkable. According to the results,after completion of construction period,the maximum dam settlement is 50.73 cm,which appears in the central axis line of core wall,about 1/2 of dam height of riverbed section.Horizontal displacement distributes symmetrically. The dam stress distribution demonstrates certain arch effect.Extreme of stress level SL increases to 0.80 in storage period which appears in the lower part of upstream transitional layer.During the earthquake of ah=2.44 m/s2,the maximum displacement increases from bottom to top,the maximum in up-down stream direction is 6.3cm occurred in the center of dam crest. The maximum amplification coefficient of acceleration of the dam is 3.23. The maximum dynamic shear stress is about 150 KPa,which meets the dynamic strength requirement.Liquefaction failure could not happen for the value of dynamic pore water pressure ratio is much small than 1.0. All the indexes are in a reasonable range,which indicates that the dam has good seismic resistance stability.
机译:建科水电站位于四川省阿坝州藏族Qian族自治州松潘县,属于川西高原东南部,川西北西北部的山区和沟壑区。建科市作为主要水库,是茅尔盖河水电“一库三瀑布”开发的第一步。项目区位于川青海域东北,最重要的构造是Min江断裂带和龙门山断裂带,地震活动频繁。以建科岩心墙堆石坝为研究对象,基于3D非线性有限元法分析了该坝的静,动力特性。结果表明,堤岸边坡约束作用强烈,空间效应显着。根据计算结果,施工期结束后,最大水坝沉降量为50.73 cm,出现在心墙中心轴线上,约为河床断面坝高的1/2。水平位移对称分布。大坝应力分布表现出一定的拱效应。在存储期,应力水平SL的最大值增加到0.80,出现在上游过渡层的下部。在ah = 2.44 m / s2地震中,最大位移从底部到顶部增加,在坝顶中心出现的最大水流方向为6.3cm。坝的最大加速度放大系数为3.23。最大动剪应力约为150 KPa,满足动强度要求。动孔隙水压力比小于1.0时,不会发生液化破坏。所有指标均在合理范围内,表明该坝具有良好的抗震稳定性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号