Analysis of Performance of Fuzzy Logic-Based Production Scheduling by Simulation

机译:基于模糊逻辑的生产调度性能仿真分析

获取原文
获取原文并翻译 | 示例

摘要

In this paper, a new fuzzy logic-based approach to production scheduling in the presence of uncertain disruptions is presented. The approach is applied to a real-life problem of a pottery company where the uncertain disruption considered is glaze shortage. This disruption is defined by two parameters that are specified imprecisely: number of glaze shortage occurrences and glaze delivery time. They are modelled and combined using standard fuzzy sets and level 2 fuzzy sets, respectively. A predictive schedule is generated in such a way as to absorb the impact of the fuzzy glaze shortage disruption. The schedule performance measure used is makespan. Two measures of predictability are defined: the average deviation and the standard deviation of the completion time of the last job produced on each machine. In order to analyse the performance of the predictive schedule, a new simulation tool FPSSIM is developed and implemented. Various tests carried out show that the predictive schedules have good performance in the presence of uncertain disruptions.
机译:在本文中,提出了一种在不确定中断的情况下基于模糊逻辑的生产调度新方法。该方法适用于陶艺公司的现实问题,其中不确定的破坏因素是釉料短缺。这种破坏是由两个参数来定义的,这些参数没有精确指定:釉料短缺的发生次数和釉料的输送时间。它们分别使用标准模糊集和2级模糊集进行建模和组合。以吸收模糊釉料短缺破坏的影响的方式生成预测时间表。所使用的进度绩效衡量标准是制造跨度。定义了两种可预测性度量:每台机器上完成的最后一项作业的完成时间的平均偏差和标准偏差。为了分析预测进度表的性能,开发并实施了新的仿真工具FPSSIM。进行的各种测试表明,在不确定的中断存在的情况下,预测时间表具有良好的性能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号