首页> 外文会议>AACE international conference expo >Overhead Costs in Delay and Productivity Claims
【24h】

Overhead Costs in Delay and Productivity Claims

机译:延迟和生产力的开销成本索赔

获取原文

摘要

Project overhead cost claims are often submitted when construction projects experience delays and productivity impacts. The claimed costs often include both home and field overhead costs and is the contractor's attempt to recover damages. This paper will discuss methodologies to calculate and evaluate these costs, including identification of common pitfalls and mistakes, and advantages and disadvantages of each method. It will also explain how a contractor's accounting system and bid documents can be used for evaluation of these claims. This paper will provide the reader with a better understanding of various overhead calculations and evaluations for delay and productivity claims.
机译:项目架空成本索赔通常在建设项目经历延误和生产力的影响时提交。要求保护的费用通常包括家庭和现场开销成本,并且承包商试图恢复损害。本文将讨论计算和评估这些成本的方法,包括识别常见的缺陷和错误,以及每种方法的优缺点。它还将解释承包商的会计系统和投标文件如何用于评估这些索赔。本文将为读者提供更好地理解各种架空计算和延迟和生产力索赔的评估。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号