首页> 外文会议>AACE international conference expo >Progress Measurement for Owners
【24h】

Progress Measurement for Owners

机译:业主的进度测量

获取原文

摘要

Progress measurement from an owner's perspective is always a challenge. Many aspects to achieve a balance between the levels of detail a contractor provides versus the level of detail an owner must have to perform essential verification and validation of the work should be considered. A clearly communicated strategic direction and philosophy is essential as a foundation for effective progress measurement. Certainly, the work breakdown structure (WBS), the methods used for measuring progress, the accuracy of data, and the system of record are all important factors for progress measurement. A sound mechanism can deliver expected progress reporting results. This paper will focus on what an owner can do to better define a methodology for progress measurement, with emphasis on: 1. Providing formal instructions and requirements to contractors for required information. 2. Instituting standardization of rules of credit. 3. Providing a stable platform for collecting progress measurement data to facilitate reporting. This paper will provide examples of tools and techniques to implement a sustainable progress measurement methodology from an owner's perspective that can be used to mitigate the challenges of accurately measuring projects.
机译:业主角度的进度测量始终是一个挑战。在承包商的详细程度之间实现平衡的许多方面提供了与所有者必须必须考虑执行必要验证和验证工作的细节水平。明确传达的战略方向和理念是作为有效进展测量的基础。当然,工作崩溃结构(WBS),用于测量进度的方法,数据的准确性以及记录系统是进展测量的重要因素。声音机制可以提供预期的进度报告结果。本文将重点关注所有者可以更好地定义进度测量方法,重点是:1。为所需信息提供对承包商的正式说明和要求。 2.机构学分规则的标准化。 3.为收集进度测量数据提供稳定的平台,以便于报告。本文将提供从所有者的角度来实现可持续进度测量方法的工具和技术的例子,这些方法可用于减轻准确测量项目的挑战。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号