首页> 外文会议>ASME International Conference on Ocean, Offshore and Arctic Engineering >VERIFICATION OF A NUMERICAL MODEL OF THE OFFSHORE WIND TURBINE FROM THE ALPHA VENTUS WIND FARM WITHIN OC5 PHASE III
【24h】

VERIFICATION OF A NUMERICAL MODEL OF THE OFFSHORE WIND TURBINE FROM THE ALPHA VENTUS WIND FARM WITHIN OC5 PHASE III

机译:验证OC5阶段III内αventus风电场的海上风力涡轮机的数值模型

获取原文

摘要

The main objective of the Offshore Code Comparison Collaboration Continuation, with Correlation (OC5) project, is validation of aero-hydro-servo-elastic simulation tools for offshore wind turbines (OWTs) through comparison of simulated results to the response data of physical systems. Phase III of the OC5 project analyzes the Senvion 5M wind turbine supported by the OWEC Quattropod from the alpha ventus offshore wind farm. This paper shows results of the verification of the OWT models (code-to-code comparison). A subsequent publication will focus on their validation (comparison of simulated results to measured physical system response data). Based on the available data, the participants of Phase III set up numerical models of the OWT in their simulation tools. It was necessary to verify and to tune these models. The verification and tuning were performed against an OWT model available at the University of Stuttgart - Stuttgart Wind Energy (SWE) and documentation provided by Senvion and OWEC Tower. A very good match was achieved between the results from the reference SWE model and models set up by OC5 Phase III participants.
机译:近海码比较协作延续的主要目的,通过相关性(OC5)项目,是通过对物理系统的响应数据的比较来验证用于海上风力涡轮机(OWTS)的航空风力涡轮机(OWTS)。 OC5项目的第III阶段分析了由OWEC Quattropod的雪原5M风力涡轮机从Alpha Ventus海上风电场支撑。本文显示了OWT模型的验证结果(代码为代码比较)。随后的出版物将重点关注其验证(模拟结果对测量物理系统响应数据的比较)。基于可用数据,III阶段的参与者在其仿真工具中设置OWT的数值模型。有必要验证并调整这些模型。验证和调整是针对斯图加特大学的OWT模型进行的,由斯图加尔风能(SWE)和由森西和OWEC Tower提供的文件进行。由OC5阶段III参与者设置的参考SWE模型和模型之间的结果之间实现了非常好的匹配。

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号