首页> 外文会议>International Conference on Economic Management and Model Engineering >Research on cost interval and cost influencing factors of power grid technical transformation project based on midpoint correction score method
【24h】

Research on cost interval and cost influencing factors of power grid technical transformation project based on midpoint correction score method

机译:基于中点校正分数法的电网技术改造项目成本间隔和成本影响因素研究

获取原文

摘要

In this paper, the midpoint correction Score method is used to determine the cost interval of technical transformation projects for power grid production. The cost analysis of various types of projects in the technical transformation of power grid production is carried out, and the factors affecting the cost of various projects are studied, so as to provide references for the lean management of production technical transformation project cost.
机译:本文使用中点校正得分方法用于确定电网生产技术转型项目的成本间隔。 进行了电网生产技术转型中各种项目的成本分析,研究了影响各项项目成本的因素,为生产技术改造项目成本的精益管理提供了参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号