首页> 外文会议>Stormwater and green infrastructure symposium >Triple Bottom Line Cost Benefit Analysis of Mirabeau Water Garden Manuscript
【24h】

Triple Bottom Line Cost Benefit Analysis of Mirabeau Water Garden Manuscript

机译:Mirabeau水上花园手稿的三倍底线成本效益分析

获取原文

摘要

Triple Bottom Line Cost Benefit Analysis (TBL-CBA) was conducted for the proposed Mirabeau Water Garden, an urban stormwater park, in the City of New Orleans in Louisiana. The project is among a suite of green infrastructure (GI) projects in New Orleans seeking to reduce flooding and subsidence, while providing environmental, social, health, educational, and economic co-benefits to communities. The TBL-CBA approach broadens traditional financial analysis to incorporate, and value social and environmental factors within an expanded CBA framework. The TBL-CBA for the proposed Mirabeau Water Garden assessed financial (e.g. capital expenditures, operations and maintenance costs), environmental (e.g. air pollution, water quality), and social (e.g. avoided flood damage, property value uplift/aesthetic, and recreational value) impacts. The proposed Mirabeau Water Garden is expected to generate a triple bottom line net present value (TBL-NPV) over its life in the order of $79 million. When uncertainty is incorporated through Monte Carlo, both lower and upper bound TBL-NPV estimates continue to be positive.
机译:在路易斯安那州新奥尔良市的建议的Mirabeau水上花园,拟议的Mirabeau水上花园进行了三倍的底线成本效益分析(TBL-CBA)。该项目是在新奥尔良的新奥尔良的一套绿色基础设施(GI)项目之一,寻求减少洪水和沉降,同时为社区提供环境,社会,健康,教育和经济共处。 TBL-CBA方法拓宽了传统的财务分析,以纳入扩展CBA框架内的社会和环境因素。拟议的Mirabeau水上花园的TBL-CBA评估财务(例如资本支出,运营和维护成本),环境(例如空气污染,水质)和社会(例如避免洪水损害,财产价值隆起/美学和娱乐价值)影响。拟议的Mirabeau水上花园预计将在其寿命中产生三重底线净值(TBL-NPV),大约为7900万美元。当通过蒙特卡罗结合不确定性时,较低和上限的TBL-NPV估计仍然是阳性的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号