首页> 外文会议> >Initial Thermal Performance of Diavik's A21 Dike
【24h】

Initial Thermal Performance of Diavik's A21 Dike

机译:Diavik A21 Dike的初始热性能

获取原文

摘要

Following four years of construction, a new open-pit to access a diamondiferous kimberlite pipe (A21 Pipe), was officially opened at the Diavik Diamond Mine on August 20, 2018. The site is located approximately 300 km northeast of Yellowknife, NT, in a zone of continuous permafrost. The A21 Pipe is in a depression just offshore of South Island in Lac de Gras that had developed a through talik. A 2,200 m long ring dike was constructed to allow dewatering of the depression and to mine the kimberlite pipe by open-pit mining. Near the lake shore, the rockfill dike is founded on permafrost, whereas in deeper waters, the foundation is on unfrozen lakebed sediments and till over bedrock. A cut-off wall was installed to reduce seepage through the dike and its unfrozen foundation. Within the section of the dike founded on permafrost, the frozen soil and bedrock are used as a hydraulic barrier. It was therefore essential to understand the extent of the permafrost into Lac de Gras, especially on the South Abutment, where the water is shallow, and the lakebed topography forms a complex-shaped submerged peninsula with talik under the permafrost. Boreholes and geophysical surveys were used to estimate the extent of the talik and provide input for the design. During the initial phase of construction, extensive ground temperature monitoring and detailed observations were used to verify the extent of permafrost assumed in the design. These measures helped with the understanding of the complex ground thermal regime and provided information on the thermal behaviour of the foundation required to guide some of the construction decisions, such as the required initiation of active freezing by the use of thermosyphons or the timing of the placement of additional dike embankment construction material to accurately lock in winter frost and protect the permafrost from thawing.
机译:经过四年的建设,于2018年8月20日在Diavik钻石矿正式开通了一条通向金刚石金伯利岩管道的新露天矿(A21管道)。该矿场位于新南威尔士州耶洛奈夫东北约300公里处。连续多年冻土区。 A21管道位于Lac de Gras南岛南部的一个凹陷中,该凹陷已发展为直通口。建造了一个2,200 m长的环形堤坝,以使洼地脱水并通过露天开采来开采金伯利岩管道。在湖岸附近,堆石堤位于多年冻土上,而在更深的水域中,地基位于未冻结的湖床沉积物上,直至基岩之上。安装了防渗墙以减少堤防及其未冻结基础的渗漏。在以多年冻土为基础的堤防部分中,冻结的土壤和基岩被用作水力屏障。因此,至关重要的是要了解进入Lac de Gras的多年冻土的程度,特别是在南岸,那里的水很浅,并且湖床地形形成了一个复杂形状的淹没半岛,在多年冻土下有滑石粉。钻孔和地球物理调查被用来估计滑石的程度,并为设计提供输入。在施工的最初阶段,广泛的地面温度监测和详细的观察被用来验证设计中假定的多年冻土程度。这些措施有助于了解复杂的地面热状况,并提供了一些基础知识,以指导某些施工决策,例如,通过使用热虹吸管或主动放置冰浆来启动主动冻结所需的信息。附加的堤防路堤建筑材料,以准确锁定冬季霜冻并保护多年冻土免于融化。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号