首页> 外文会议>International conference on cold regions engineering >Initial Thermal Performance of Diavik's A21 Dike
【24h】

Initial Thermal Performance of Diavik's A21 Dike

机译:Diavik的A21堤防初始热性能

获取原文

摘要

Following four years of construction, a new open-pit to access a diamondiferous kimberlite pipe (A21 Pipe), was officially opened at the Diavik Diamond Mine on August 20, 2018. The site is located approximately 300 km northeast of Yellowknife, NT, in a zone of continuous permafrost. The A21 Pipe is in a depression just offshore of South Island in Lac de Gras that had developed a through talik. A 2,200 m long ring dike was constructed to allow dewatering of the depression and to mine the kimberlite pipe by open-pit mining. Near the lake shore, the rockfill dike is founded on permafrost, whereas in deeper waters, the foundation is on unfrozen lakebed sediments and till over bedrock. A cut-off wall was installed to reduce seepage through the dike and its unfrozen foundation. Within the section of the dike founded on permafrost, the frozen soil and bedrock are used as a hydraulic barrier. It was therefore essential to understand the extent of the permafrost into Lac de Gras, especially on the South Abutment, where the water is shallow, and the lakebed topography forms a complex-shaped submerged peninsula with talik under the permafrost. Boreholes and geophysical surveys were used to estimate the extent of the talik and provide input for the design. During the initial phase of construction, extensive ground temperature monitoring and detailed observations were used to verify the extent of permafrost assumed in the design. These measures helped with the understanding of the complex ground thermal regime and provided information on the thermal behaviour of the foundation required to guide some of the construction decisions, such as the required initiation of active freezing by the use of thermosyphons or the timing of the placement of additional dike embankment construction material to accurately lock in winter frost and protect the permafrost from thawing.
机译:在建设四年后,在2018年8月20日在Diavik Diamond Mine正式开设了一款新的露天坑,在Diavik Diamond Mine正式开业。该网站位于NT,NT的黄酮东北约300公里连续永久冻土区。 A21管道位于南岛近海的萧条,在Lac de Gras开发了一个穿过塔利克。建造了2,200米长的环堤,以允许抑郁症脱水并通过露天开采挖掘金伯拉特管。靠近湖岸附近,罗克堤堤在永久冻土上成立,而在深水中,基金会是在Undrozen湖床沉积物上,直到基岩。安装了一个截止墙,以减少堤防渗透及其未冷却的基础。在堤防成立的堤坝内,冷冻的土壤和基岩用作液压屏障。因此,必须了解多年冻土的程度,特别是在南桥上,水很浅,湖床地形形成一个复杂的浸没式半岛,在永久冻土下形成塔利克。钻孔和地球物理调查用于估计Talik的范围,并为设计提供输入。在初始阶段期间,广泛的地温监测和详细观察用于验证设计中假设的永久冻土的程度。这些措施有助于了解复杂的地面热制度,并提供了有关引导某些施工决策所需的基础的热行为的信息,例如通过使用热悬浮孔或放置的时序所需的激活冻结所需的启动额外的堤防堤防建筑材料准确锁在冬季霜冻中,保护永久冻土免受解冻。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号