首页> 外文会议>IEEE Asia Power and Energy Engineering Conference >A Novel Inverse Time Protection Scheme of Large Generator Based on Polynomial Optimal Fitting
【24h】

A Novel Inverse Time Protection Scheme of Large Generator Based on Polynomial Optimal Fitting

机译:基于多项式最优装配的大发电机的新型逆时间保护方案

获取原文

摘要

Inverse time protection is a typical backup protection for large generator, and the suitable setting value is critical to ensure the security of both the generator and power system. The existing protection setting methods recommended by the standard or specification cannot meet the coordination relationship of the protection, and the determined operating time may exceed the generator's affordability. A polynomial optimal fitting based inverse time protection for large generator is proposed in this paper. Firstly, the operation characteristic of the protection is determined according to the heating process of the generator under abnormal conditions. The least square method is then used to fit the coefficients in the characteristic expression. Finally, the proposed method is tested by actual generator parameters, and the results demonstrate that the protection can achieve the optimal matching between the operation characteristic and the generator capacity curve. Besides, the protection can operate in a time extremely close to the maximum ability of the generator, which means to provide more effective support for the power system while ensuring the generator safety.
机译:逆时间保护是大发电机的典型备份保护,并且合适的设定值对于确保发电机和电力系统的安全性至关重要。标准或规范建议的现有保护设置方法不能满足保护的协调关系,所确定的运行时间可能超过发电机的负担能力。本文提出了一种基于大发电机的逆时间保护的多项式最优拟合。首先,根据异常条件根据发电机的加热过程确定保护的操作特性。然后使用最小二乘法以适应特征表达中的系数。最后,通过实际发生器参数测试所提出的方法,结果表明,保护可以在操作特性和发电机容量曲线之间实现最佳匹配。此外,保护可以在极近发电机的最大能力的时间内操作,这意味着为确保发电机安全提供电力系统的更有效支持。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号