首页> 外文会议>Geohunan international conference >Study on Construction Methods for Tunnels of Large Cross-Section Excavated in Weak Rocks
【24h】

Study on Construction Methods for Tunnels of Large Cross-Section Excavated in Weak Rocks

机译:弱岩大横截面隧道施工方法研究

获取原文

摘要

The double side drift method, CRD and CD method are widely adopted for super large cross-section excavation for tunnel in weak rock in China. Further, it is shown good adaptability because of the extensive application in highway, railway, especially in urban underground facilities. However, there are also some problems in work efficiency, structure safety and engineering management and so on. It is necessary to make optimization of construction methods under these conditions. In this paper these shortcomings for double side drift, CRD and CD methods are detailed. The work efficiency, load conversion mechanism and the influence on tunnel structure, and construction management are discussed. Then suggestions for tunnel excavation determination in such conditions are put forward. It is shown that if auxiliary measures are adopted first, partial excavation could be abandoned. Even full-face excavation may be feasible. The principle proposed in this paper has been used in practice, which is proved once more for tunnel excavation in soft and weak surrounding ground.
机译:双侧漂移法,CRD和CD法广泛采用了中国弱岩隧道的超大横截面挖掘。此外,由于高速公路,铁路,特别是城市地下设施的广泛应用,它显示出良好的适应性。但是,工作效率,结构安全和工程管理等问题也存在一些问题。在这些条件下有必要在施工方法中进行优化。本文详细说明了双面漂移,CRD和CD方法的这些缺点。讨论了工作效率,负载转换机制和对隧道结构的影响和施工管理。然后提出了在这种条件下进行隧道挖掘确定的建议。结果表明,如果首先采用辅助措施,则可以抛弃部分挖掘。即使是全面的挖掘也可能是可行的。本文提出的原理已在实践中使用,这在柔软和弱周围地面的隧道挖掘一次被证明。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号