首页> 外文会议>International Conference on Ubiquitous Computing and Ambient Intelligence >Management of the Hypertension: An Architecture Based on BPM Integration
【24h】

Management of the Hypertension: An Architecture Based on BPM Integration

机译:高血压管理:基于BPM集成的架构

获取原文

摘要

Hypertension affects eight out of ten adult population over 65 years. Healthcare processes require interdisciplinary cooperation and coordination between medical teams, clinical process and patients. The lack of patients' empowerment and adherence to treatment makes it necessary to integrate patients, data collecting devices and the clinical process together. The use of Business Process Management (BPM) paradigm and their associated technologies as an integrating tool throughout the clinical process of coordinating the data collected hypertension patients through the devices, the clinical process and the needs of the medical equipment is proposed.
机译:高血压超过65年的成年人口中的八个。医疗过程需要医疗团队,临床过程和患者之间的跨学科合作和协调。缺乏患者的赋权和遵守治疗使得必须将患者,数据收集装置和临床过程集成在一起。建议使用业务流程管理(BPM)范式及其相关技术作为整合工具,在整个临床过程中通过设备协调数据收集的高血压患者,临床过程和医疗设备的需求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号