Thickwood Interchange and Highway 63 Tangent Pile Wall

机译:奶奶互换和高速公路63切线桩墙

获取原文

摘要

The Thickwood Boulevard Interchange is being constructed in conjunction with the Highway 63:11 Corridor improvements through Fort McMurray to accommodate extremely high volumes of local and commuter traffic, in addition to overdimensioned vehicles going to the oil sands through this very constrained corridor. The Hwy 63:11 corridor improvement involves a combination of grade widening and new construction of 9.5km of freeway, from 4 to 6 lanes, and the construction of C-D lanes (1 to 3 lanes) from downtown to Confederation Way. When complete there will also be 3 new bridges constructed across the Athabasca River which will provide a total of 10 lanes of traffic. AECOM was retained by Alberta Transportation to provide preliminary engineering, detail design, tender preparation, construction supervision, contract administration and post-construction services for the Thickwood Boulevard Interchange in Fort McMurray. This involves converting the existing at-grade signalized intersection to a "trumpet" interchange to facilitate the high volume northbound left turn movement which is currently handled by a 3-lane dedicated left turn bay. Innovative design solutions were required to address: 1.Hillside geotechnical stability due to an abundance of weak compressible clays and layers of oil sands in the subsurface; 2. Restricted right-of-way with Highway 63:11 wedged between a steep hill to the west and the Athabasca River to the east; 3. Horizontal and vertical sight distance issues from the north side of the river bridges up to the Thickwood Boulevard Interchange; 4. Congested utilities within this narrow right-of-way; 5. Accommodation of over-dimensioned transport trucks; 6. Incorporation of oil sand and weak compressible materials overlying bedrock found on site in embankment construction; 7. Permitting from major pipeline companies, municipal infrastructure, storm pond and outfall facilities, existing fish bearing creek; and 8. Tender schedule to meet the overall staging plan of the entire Highway 63 corridor for 6-lane conversion. Innovative designs solutions that AECOM incorporated into the project included: 1. A two level MSE wall retaining system to accommodate the over-dimensioned vehicles traveling to the oil sands sites to the north, with the wall system designed to address huge ice flows during spring break-up; 2. Large scale multimillion dollar utility relocations and installations throughout the length of the project limit to tie-in to various infrastructures, allowing the corridor to be cleared of utilities prior to the road construction; 3. Construction of extensive secant and tangent pile wall systems both at the base of the steep slope below the Thickwood subdivision and along the Athabasca River to mitigate slope failures and enable the realignment of Highway 63 into the valley slope; 4. Develop and provide an adequate width to accommodate the highway widening and a new C-D roadway; 5. A Vulcan Gate interlocking movable centre median barrier system to accommodate over-dimensioned transport trucks maneuvering between Thickwood Boulevard Interchange and the next interchange north at Confederation Way should over-dimensioned transport trucks not be able to access the highload bypass; 6. An Open Bottom Arch culvert of deep corrugated structural steel designed for Conn Creek to span 90m across 10 lanes of traffic while minimizing disturbance to the natural channel -preserving or improving fish habitat. 7. An automated anti-icing system incorporated into all bridges to increase safety for road users.
机译:通过麦克马顿堡,厚厚的大道互换与高速公路63:11走廊改进,以满足极高的本地和通勤交通,除了过度限制的走廊,还提供了过量的车辆。 HWY 63:11走廊改进涉及等级扩大和新建的高速公路的组合,从4到6个车道,以及从市中心到联邦方式的C-D车道(1到3个车道)的建设。在完成时,还将有3个在Athabasca River中建造的3个新桥梁,将共提供10个交通车道。 AECOM被艾伯塔省运输保留,为麦克马雷堡牛仔大道交汇处提供初步工程,详细设计,招标,施工监督,合同管理和建造后服务。这涉及将现有的AT级信号交叉口转换为“小号”交换,以便于由3车道专用左转托架处理的高批量北行左转移动。需要创新的设计解决方案来解决:1。优先旁边的岩土工程稳定性,由于地下的丰富可压缩粘土和油砂层; 2.限制高速公路63:11楔入陡峭的山丘和东部的陡峭山之间; 3.水平和垂直瞄准距离从河边北侧桥梁桥梁到厚厚的大道互换; 4.这种狭窄的右路中拥挤的公用事业; 5.提供超尺寸的运输卡车; 6.在堤防建设中,在现场发现的石油砂和弱可压缩材料覆盖的覆盖; 7.允许主要管道公司,市政基础设施,风暴池塘和排水设施,现有鱼类毛溪; 8.招标计划,以满足整个高速公路63走廊的整体分期计划,用于6车道转换。创新设计解决方案包括:1。一台2级MSE墙挡土系统,以容纳到北方的油砂部位的过度尺寸的车辆,墙壁系统旨在在春假期间解决巨大的冰流量-向上; 2.在项目限制的整个长度内迁移到各种基础架构的大规模百万美元实用程序重新分配和安装,允许走廊在道路建设之前清除公用事业; 3.在厚厚的坡度下方和沿着Athabasca河下方的陡坡底部的底座和切线桩墙系统的构建,以减轻斜坡故障,并使高速公路63重新调整到山谷坡度; 4.开发并提供足够的宽度以适应高速公路扩大和新的C-D道路; 5.一个普拉法门互锁可移动中心中值障碍系统,以容纳厚厚的运输卡车在厚厚的大道交汇处和下一个交汇处,在联盟的方式,应该超尺寸的运输卡车无法进入高载荷; 6.深度波纹结构钢的开放底拱涵洞,专为Conn Creek为跨越90米的跨越10辆,同时最大限度地减少对自然通道的干扰 - 持续或改善鱼类栖息地。 7.纳入所有桥梁的自动防冰系统,以增加道路使用者的安全性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号