首页> 外文会议>SPE Asia Pacific Oil Gas Conference and Exhibition >Installation of Annulus Cement Plugs Using Perforation, Wash and CementTechnique, a Lookback from a First for Australia
【24h】

Installation of Annulus Cement Plugs Using Perforation, Wash and CementTechnique, a Lookback from a First for Australia

机译:使用穿孔,洗涤和粘液塞的环形水泥插头,从第一个澳大利亚寻找

获取原文

摘要

The Gorgon Foundation Project (GFP) development comprises of the Gorgon and Jansz-Io gas fields locatedin offshore Western Australia. To maintain gas supply, the Gorgon Stage 2 (GS2) project will expand theexisting infrastructure with additional subsea production wells. The Gorgon Stage 2 (GS2) well architectureis designed to deliver a 7 5/8 in. tubing × 7 in. production liner Cased Hole Orientated Perforation completion(CHOP). An unsuccessful production liner primary cement job resulted in an area of uncemented wellbore -casing annulus and a sand containing mobile water exposed. This led to the unresolvable uncertainty ofwater crossflow into adjacent produced sands. Under the current flow assurance restrictions, the risk ofproduced water could reduce production rates or require the well to be shut-in. To mitigate water flowpotential, cement plug annulus impediments (baffles) were installed. The objective of these plugs are forreservoir management, not abandonment barrier plugs. This allowed an optimized scope for verificationand contingency operations planned and executed. This paper provides an insight into the collaborative efforts made by the Subsurface, Drilling andCompletions (Wells) teams and Service Partners to plan and successfully execute two (2) Perforate, Washand Cement plug jobs. Operations include the use of Tubing Conveyed Perforations (TCP) and Closed LoopCup Type Wash and Cement tool, a first for Chevron in Australia. The cement plugs were deployed from asemi-submersible in ~220 m of water and placed at depths of ~5,700 mMD and ~5,500 mMD respectively,at inclinations of 60° and in high static bottom hole temperatures up to ~157°C. The key challenges and lesson are discussed including planning to optimize swab cup integrity in hightemperature operations.
机译:Gorgon基金会项目(GFP)开发包括位于澳大利亚海外西澳大利亚州的Gorgon和Jansz-IO天然气领域。为了维护气体供应,GORGON第2阶段(GS2)项目将通过额外的海底生产井扩展基础设施。 GORGON第2阶段(GS2)井架构旨在提供7 5/8英寸。管道×7英寸。生产衬垫套管孔定向穿孔完成(CHOP)。不成功的生产衬里主水泥作业导致未井网的面积为环,露出含有含有流动水的沙子。这导致了对水中的难以解决的不确定性进入相邻的产生的砂岩。在目前的流动保障限制下,卓越的水风险可以降低生产率或要求井关闭。为了减轻水流量,安装了水泥栓环形障碍(挡板)。这些插头的目的是Forreservoir管理,而不是放弃屏障插头。这允许计划和执行的验证和应急操作的优化范围。本文介绍了地下,钻探和补货(WELLS)团队和服务合作伙伴制定和成功执行两(2)个穿孔的合作努力的洞察力。操作包括使用管道输送的穿孔(TCP)和封闭的Loopcup型洗涤和水泥工具,是澳大利亚的雪佛龙首先。将水泥塞从〜220米水中的含量潜水部署,分别以〜5,700 mmd和〜5,500mmd的深度置于60°,高静态底部孔温度高达约157°C。讨论了关键挑战和课程,包括规划在高温操作中优化拭子杯完整性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号