首页> 外文会议>SPE Asia Pacific Oil Gas Conference and Exhibition >What We Have Learned on Shale Gas Fracturing During the Past Five Years in China
【24h】

What We Have Learned on Shale Gas Fracturing During the Past Five Years in China

机译:过去五年在中国的页岩气压裂中学到了什么

获取原文

摘要

Scale development of shale gas in North America has greatly stimulated the enthusiasm of China. Since July 30, 2010 the first shale gas well fracturing, more than 300 wells have been fractured in the past five years in China, an average post-frac production is more than 6E4m3 /d for one well. Technology include pre-frac evaluation, the methods of fracturing design, fracturing materials, tools and equipment, gas factory workflow and quality control system has formed. Basis on the study following recognition can be drawn: ①natural fracture distribution、stress difference and fluid viscosity are the key factors to create the complex fracture; ②geological engineering integration concept has been implemented and application successful; ③formulated the principle to improve SRV+3C (complexity, connective, conductivity), design method of shale gas reservoir stimulation has formed; ④formed including of transverse fracture to the horizontal wellbore set, PNP multi-stage fracturing, "the 3 big 2 low 1 small" (Large amount of liquid, proppant, high injection rate. Low fluid viscosity, sand concentration. Small diameter particle combination proppant) design, real-time quality control techniques, and multi-well simulfrac/zipperfrac technology, gas factory workflow, etc.; ⑤ construction capacity and parameters have reached the normal level of North America. Horizontal lateral up to 1000-2000m, single stage 60-100m, single well stages up to 25; For one stage fluid volume is generally 1600-2200 m~3 , proppant is normally 60-170t/stage, pumping rate is 8 -16 m~3 / min; Usually for zipper-frac 2-4 stages can be finished in daytime, and 6 stages for simul-frac, post-frac production is from 6 to 55 (E4 m~3 /d) for a single well. In this paper, not only successful experience on shale gas well fracturing are presented, but also some challenges, such as casing deformation, frature discription, water shortage etc.
机译:北美页岩气的规模发展极大地刺激了中国的热情。自2010年7月30日起,第一次页岩气进屑井压裂,在中国过去五年中有300多家井已经发生裂缝,平均近距离产量超过6e4m3 / d。技术包括FRAC预调评,压裂设计方法,压裂材料,工具和设备,气体厂工作流程和质量控制系统已形成。基础上的研究可以绘制以下识别:①自然骨折分布,应力差和流体粘度是产生复杂骨折的关键因素; ②地面工程整合概念已实施和应用成功; ③改善SRV + 3C(复杂性,结缔,电导率),页岩气储层刺激设计方法的原理形成; ④电形包括横向骨折到水平井筒套,PNP多级压裂,“3大2低1小”(大量液体,支撑剂,高注射率。低流体粘度,砂浓度。小直径粒子组合支撑剂)设计,实时质量控制技术和多井Simulfrac / Zipperfrac技术,天然气工厂工作流等; ⑤施工能力和参数已达到北美正常水平。水平横向高达1000-2000m,单级60-100m,单井阶段高达25;对于一个阶段液体体积通常为1600-2200 m〜3,支撑剂通常为60-170t /级,泵送率为8 -16 m〜3 / min;通常用于拉链 - FRAC 2-4阶段可以在白天完成,并且SIMUL-FRAC的6个阶段,FRAC后期的速度为6至55(E4M〜3 / D)。在本文中,不仅提出了对页岩气井压裂的成功经验,但也存在一些挑战,例如套管变形,疲惫,缺水等。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号