Conceding Too Much? Conflicts between the Government and Developers in Promoting the China 'Wind Concession' Project Model

机译:太多了?政府与开发商之间推动中国“风特许权”项目模型的冲突

获取原文

摘要

Grid-connected wind power has been developed in China since the mid-1980s, with about 535 megawatts (MW) of generation capacity on-line at the end of 2003. The development of generation capacity has been steady but slow, with current capacity comprising only a fraction of the estimated 250 gigawatts (GW) of exploitable resources. A major reason for limited wind energy development is that policy mechanisms designed to support a market for wind power in China have instead been found by developers to be confusing and contradictory. Project approval procedures are unclear, and vary from province to province. Approval for large-scale, often more economically viable projects, must come from the central government and is often difficult to obtain. Information concerning technical details and costs of grid interconnection and transmission is not readily available to potential developers. Long term power purchase agreements (PPA) are rare, and a "cost plus profit" pricing policy has resulted in relatively high tariffs that may fluctuate over time.
机译:自20世纪80年代中期以来,中国已经在中国开发了电网,在2003年底,在线上发电量大约535兆瓦(MW)。发电能力的发展一直是稳定但缓慢的,目前的能力包括只有一小部分估计的250千兆瓦(GW)的可利用资源。风能发展有限的主要原因是,旨在支持中国风电市场的政策机制已经发现,开发人员发现令人困惑和矛盾。项目批准程序尚不清楚,从省市到省份不同。批准大规模,往往更经济上可行的项目,必须来自中央政府,往往难以获得。潜在的开发人员没有易于使用有关技术细节和网格互连和传输成本的信息。长期电力购买协议(PPA)是罕见的,“成本加入”定价政策导致相对高的关税,可能随着时间的推移而波动。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号