Delivery of CentrePort Canada Way

机译:提供Centreport Canada Way

获取原文

摘要

In October 2008, Manitoba passed the CentrePort Canada Act to establish CentrePort Canada as Manitoba's inland port in northwest Winnipeg and the Rural Municipality of Rosser to attract and coordinate business investment. In April 2009, Manitoba and Canada announced a cost share agreement totalling $212M to fund the construction of CentrePort Canada Way (CCW), which is intended to be the road transportation backbone of the 20,000-acre CentrePort Canada development zone. The concept for CCW called for a four lane expressway approximately 10km long between Winnipeg's Perimeter Highway and Brookside Boulevard including a major interchange and two rail grade separations on a route which had never been considered before. This is a greenfield project with all proposed roadways being new construction on new location. Construction was mandated to begin in 2010 with a 2013 completion date. This paper tracks the extraordinary measures Manitoba Infrastructure and Transportation (MIT) undertook to meet the fast track schedule and the required construction innovations. Significant aspects include: 1. Accelerated conceptual, functional and detailed design with associated coordination challenges. 2. Concurrent development of MIT's first ever design-build process. 3. Design and construction of MIT's first mechanically stabilized earth walls. 4. Design and construction of the largest overpass structures in the province. 5. Design and construction of the largest box culverts in the province. 6. Challenges in construction staging and traffic operations. 7. Innovations in pavement rebar design and construction. 8. Innovations in accelerated consolidation of embankments.
机译:2008年10月,Manitoba通过了Centreport Canada法案,在西北温尼伯的西北部的内陆港区设立了Centreport Canada,以及罗斯特乡村的罗斯特乡村商业投资。 2009年4月,Manitoba和Canada宣布了21200万美元的成本股份协议,以资助Centreport加拿大方式(CCW)的建设,该公司旨在成为20,000英亩的Centreport Canada开发区的道路运输骨干。 CCW的概念在温尼伯的周边高速公路和Brookside Boulevard之间调用大约10公里的车道高速公路,包括在从未考虑过的路线上的主要交汇处和两个铁路级分离。这是一个Greenfield项目,所有拟议的道路都在新的位置是新的建设。建设被授权于2010年开始,2013年完成日期。本文跟踪了曼尼托巴基础设施和运输(麻省理工学院)的非凡措施,以满足快速的轨道时间表和所需的建筑创新。重要的方面包括:1。加速概念,功能和详细设计,具有相关的协调挑战。 2.麻省理工学院首次设计 - 构建过程并发开发。 3.麻省理工学院的第一个机械稳定地球墙的设计和施工。 4.全省最大立交桥结构的设计与施工。 5.全省最大盒子涵洞的设计与建设。 6.施工分期和交通运营的挑战。 7.人行道钢筋设计与建设的创新。 8.加速整合堤防的创新。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号