首页> 外文会议>Underground construction technology international conference exhibition >Pipe Bursting Project Risk Management - Contractor's Perspective
【24h】

Pipe Bursting Project Risk Management - Contractor's Perspective

机译:管道爆破项目风险管理 - 承包商的观点

获取原文

摘要

1. Dilemma 1.1 Promote Benefits of Pipe Bursting for Typical Applications 1.2 Advance Capabilities of the Pipe Bursting Technology Through Experimentation 1.3 Promote Benefits of Pipe Bursting for A-typical Applications 1.4 Maintain Credibility for the Technology 2. Solution 2.1 Educate Owners, Engineers, & Contractors of the Key Variables that Affect Success 2.2 Bring Perspective to how those Variables Affect Success 2.3 Curb Unrealistic Expectations 2.4 Classify/Qualify Associated Risks - Risk Assesment.
机译:1.1困境1.1促进管道爆破的典型应用的效果1.2通过实验推动管道爆破技术的提前能力1.3促进管道爆破的效益为典型的应用1.4维持技术的可信度2.解决方案2.1教育所有者,工程师和承包商影响成功2.2的关键变量将透视提出那些变量如何影响成功2.3遏制不切实际的期望2.4分类/限定相关风险 - 风险评估。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号