首页> 外文会议>European Rotorcraft Forum >LIFE EXTENSION AND AIRWORTHINESS We are all being asked to work longer before retirement – even military aircraft!
【24h】

LIFE EXTENSION AND AIRWORTHINESS We are all being asked to work longer before retirement – even military aircraft!

机译:生活延伸和适航性我们都被要求在退休前工作更长时间 - 即使是军用飞机!

获取原文

摘要

The effective management of risk coupled with maintaining a platforms operational capability beyond that which was initially envisaged by the initial design intent, in the face of a changing financial, organisational, technological and regulatory environment is a difficult and challenging activity. There have been a number of military and civil procurement and modification programmes which have faltered as a result of these issues and factors, e.g. the Chinook MK3 which did not receive airworthiness certificates due to issues with the avionics software (which have now been addressed by MK4). This paper discusses some of the key factors, the associated risks and their relationship to each other which need to be considered for aircraft life extension programmes. This paper also discusses the implications associated with retrospective application of rules and standards. The key factors and their associated risks in relation to aircraft life extension are common across all platforms and domains and pose specific challenges when changing an aircraft baseline. Risk is generally a well understood discipline and in its broadest terms is assessed through evaluating the probability and consequence of an event. Effective management of these factors and the risks is essential to ensure that a platform can return to service. These areas which pose risk and which have a direct influence on the platform, for the purposes of this paper have been classified as being Influencing Factors (IF's). Although at first these would appear to be obvious, Atkins experience 1 MoD UK procurement policy; Concept Assessment Development Manufacturing In-Service Disposal across a number of programmes and domains has indicated that they are often addressed separately and the inter relationships between the risks associated with each is not fully understood or managed. This can result in significant detrimental risk to the programme. Processes including the MOD Architecture Framework (MODAF) (Ref.7) provides a means to analyse the risks associated with capabilities, systems and business processes in accordance with the CADMID 1 lifecycle. However, this is more easily applied to new build programmes and is often not easily applicable to a life extension programme and the risks associated across all the disciplines.
机译:在不断变化的金融,组织,技术和监管环境面前保持超出最初设想的平台运营能力的风险的有效管理是难以和具有挑战性的活动。由于这些问题和因素,有许多军事和民事采购和修改计划,例如,这些问题和因素有效。由于航空电子软件的问题(现在已由MK4解决)而导致的Chinook MK3没有收到适航证书。本文讨论了彼此的一些关键因素,相关的风险及其关系,需要考虑飞机生命扩展程序。本文还讨论了与追溯应用规则和标准相关的影响。与飞机寿命有关的关键因素及其相关风险在所有平台和领域都很常见,并且在改变飞机基线时造成特定挑战。风险通常是一种很好的理解纪律,并通过评估事件的可能性和后果来评估最广泛的术语。有效管理这些因素和风险对于确保平台可以恢复服务至关重要。这些领域造成风险并对平台产生直接影响的领域,本文的目的被归类为影响因素(IF)。虽然起初这些似乎是显而易见的,Atkins经历1 Mod英国采购政策;概念评估开发在许多计划和域中的制造制造服务在 - 域名已表明,它们通常单独解决,并且与每个方面的风险之间的关系不完全理解或管理。这可能导致对程序的严重危险。包括MOD架构框架(MODAF)(REF.7)的过程提供了一种方法,可以根据CADMID 1生命周期分析与功能,系统和业务流程相关的风险。但是,这更容易应用于新的构建计划,并且通常不容易适用于生命扩展程序以及所有学科之间相关的风险。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号