首页> 外文会议>Rocky mountain geo-conference >Hyrum Dam's Seismic Issue Evaluation
【24h】

Hyrum Dam's Seismic Issue Evaluation

机译:Hyrum Dam的地震问题评估

获取原文

摘要

In 2009, a possible dam deficiency was identified. Hyrum dam was built over a relatively thin unconsolidated alluvial deposit that could be at risk for strength loss during a large earthquake. If large deformations were to occur because of the strength loss, the crest height might be reduced or cracking of the embankment may occur, and could potentially lead to failure. In order to assess the situation, a field investigation was completed to measure the in situ properties of the dam embankment and the alluvium; and a seismic hazard analysis was performed. A comprehensive analysis was then undertaken to estimate potential deformation and overtopping. Using the data from updated seismic loading, field investigation, and analysis, a risk analysis was performed for potential failure modes. The annualized failure probability was estimated, using an event tree approach. The risk analysis revealed that the likelihood of dam failure during a seismic event was below the Bureau of Reclamation's (reclamation) standards.
机译:2009年,确定了可能的水坝缺乏症。 Hyrum Dam是在一个相对薄的未溶胀的冲积矿床上,可能存在大地震期间强度损失的风险。如果由于强度损耗发生大变形,则可能发生嵴高度或可能发生堤坝的开裂,并且可能导致失败。为了评估局面,完成了一个现场调查,以衡量大坝路堤和加强的原位性质;并进行地震危害分析。然后进行了综合分析以估算潜在的变形和拓展。使用来自更新的地震载荷,现场调查和分析的数据,对潜在的失效模式进行了风险分析。使用事件树方法估计年度失败概率。风险分析显示,在地震事件期间坝体失效的可能性低于填海(填海)标准的局部。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号