Charlotte Water's (CLTWater) Steele Creek project includes a 30 million gallon per day pump station (firm capacity) and 35,000 feet of 36-inch diameter force main. The total construction cost is $45 million. This project provides a cost-effective solution to complex sewer system capacity challenges. This was achieved through construction of an innovative project that addresses population growth, long-term sewer system capacity, and technical issues resulting from the project's unusual downhill force main configuration. The project provided $30 million in savings, on a net-present value basis, versus other alternatives evaluated, reducing the need for the utility to make substantial improvements in the downstream sewer system. This paper presents an overview of the project including the design approach, construction challenges, and lessons learned. This paper and technical presentation will present the project background, business case, design approach, construction overview, and lessons learned.
机译:夏洛特水(Cltwater)Steele Creek项目包括每天3000万加仑泵站(牢固的容量)和35,000英寸的36英寸直径力。总建筑成本为4500万美元。该项目提供了复杂的下水道系统容量挑战的成本效益的解决方案。这是通过建设一个创新项目的创新项目来实现,这些项目解决了人口增长,长期下水道系统能力和项目不寻常的下坡势力主要配置所产生的技术问题。该项目在净值基础上提供了3000万美元的储蓄,而其他替代方案评估,减少了该效用的需要在下游下游系统中进行大量改进。本文介绍了该项目的概述,包括设计方法,建设挑战和经验教训。本文及技术演示文稿将出示项目背景,商业案例,设计方法,建设概述和经验教训。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号