首页> 外文会议>Annual Water Environment Federation technical exhibition and conference >STORING CSO IN THE MIDDLE OF BROOKLYN, OVERCOMING CHALLENGES ABOUND
【24h】

STORING CSO IN THE MIDDLE OF BROOKLYN, OVERCOMING CHALLENGES ABOUND

机译:在布鲁克林中间存储CSO,克服挑战比比皆是

获取原文

摘要

The regulatory and technical challenges associated with the design of a CSO facility to comply with a Superfund federal requirement presented the design team the unique opportunity to develop innovative solutions that will provide DEP with an operable facility that can be constructed within the timeline allowed by the Settlement Agreement. The process for evaluating and identifying solutions stemmed from detailed assessments of existing CSO facilities to understand the operational challenges and the design decisions that resulted in the noted challenges - effectively building upon past practice and lessons learned to create a better facility than the last. Once the issues were identified, the design team worked collaboratively with key stakeholders, including DEP's Bureau of Wastewater Treatment (BWT) and Bureau of Water and Sewer Operations (B WSO) through a series of workshop meetings to confirm that the proposed engineering solutions would in fact address the operational concerns regarding a facility of this size, located in a dense urban environment, characterized with old infrastructure. In most cases, the solution is based on basic engineering principles, applied in creative ways to address the unique challenges of this project.
机译:与CSO设施设计相关的监管和技术挑战,以遵守超级优惠联邦需求,提出了设计团队开发创新解决方案的独特机会,该解决方案将提供可操作的设施,可以在结算所允许的时间表内构建。协议。评估和识别解决方案的过程源于现有的CSO设施的详细评估,以了解业务挑战和设计决策,导致所指出的挑战 - 有效地建立过去的实践和经验教训,以创造比上一个更好的设施。一旦确定了问题,设计团队就通过一系列研讨会会议协同合作,包括关键利益相关者,包括DEP的废水处理(BWT)和水和下水道行动局(B WSO),以确认拟议的工程解决方案将进入事实解决了关于这种大小的设施的操作问题,位于密集的城市环境中,具有旧基础设施。在大多数情况下,该解决方案基于基础工程原则,以创造性的方式应用于解决该项目的独特挑战。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号