首页> 外文会议>AIAA SPACE conference exposition >Reducing Development Risks in NASA Science Missions Developing Instruments First
【24h】

Reducing Development Risks in NASA Science Missions Developing Instruments First

机译:降低美国宇航局科学任务的发展风险首先开发仪器

获取原文

摘要

NASA science instruments have had a history of developmental delays. These development delays can lead to cost growth for the overall mission, as shown in recent studies of NASA missions and a larger historical data set. An analysis was conducted to assess if a new mission development process, labeled instrument first, spacecraft second (IFSS), could provide reduced cost and schedule growth in future missions by minimizing the impact of instrument development issues on mission development. A cost and schedule analysis was conducted for representative Tier 2 and Tier 3 Earth Science Decadal Survey missions to quantify the benefits. The results indicate that the savings resulting from such an approach is on the order of $2B, making more funding available for future missions, while providing a less volatile and more manageable mission portfolio. This paper reviews the results of this analysis and assesses the implications of implementing such a mission development process by showing the approach on specific examples.
机译:美国航空航天局科学仪器有发展延误历史。这些发展延误可能导致整个任务的成本增长,如最近对美国宇航局任务的研究和更大的历史数据集。进行分析以评估新的任务开发过程,标记仪器首先,航天器第二(IFSS),可以通过最大限度地减少仪器发展问题对使命发展的影响来提供未来任务的降低成本和安排增长。为代表二级和第3层地球科学审计调查任务进行了成本和进度分析,以量化利益。结果表明,这种方法产生的节省大约为2亿美元,为未来的任务提供更多资金,同时提供较少的易失性和更可管理的任务组合。本文审查了该分析的结果,并评估了通过表明具体示例的方法来实施此类使命发展过程的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号