首页> 外文会议>International Conference on Ground Control in Mining >Ultra-Close Multiple-Seam Mining - Analysis and Verification
【24h】

Ultra-Close Multiple-Seam Mining - Analysis and Verification

机译:超近多缝采矿 - 分析和验证

获取原文

摘要

This paper presents the results of a detailed geotechnical study on the potential multiple seam interaction between the No. 2 Gas (upper) and the Powellton seams, which are separated by an average interburden of 45 ft. The interburden consists of 4 ft of clay shale below the No. 2 Gas seam, 38 ft of massive sandstone, and 3 ft of shale above the Powellton seam. The No. 2 Gas seam was mined about 60 years ago, and many water-pooled areas were projected to be present. The deepest overburden over the No. 2 Gas seam is about 750 ft.
机译:本文提出了对2号气体(上)和Powellton接缝之间的潜在多缝相互作用的详细岩土性研究的结果,该潜在的多缝相互作用在45英尺的平均级别中分开。律师由4英尺的粘土页岩组成在2号气体缝,38英尺的大规模砂岩,3英尺高,鲍威尔顿接缝上方的3英尺。 2号天然气缝约60年前开采,预计许多水池区都会出现。 2号煤层上最深层的覆盖层约为750英尺。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号