Located North of Rockville, Maryland, Lake Needwood Dam stands 65 feet high and has a drainage area of 12.8 square miles. Constructed in 1965 using PL-566 authority, the Soil Conservation Service (now Natural Resources Conservation Service) assisted with the planning, design and construction of the dam. The dam provides flood protection, sediment control, and recreational use. With a breach inundation area encompassing hundreds of homes and businesses, the Natural Resources Conservation Service and the Maryland Department of the Environment - Dam Safety Division classify the dam as high hazard potential. The Maryland-National Capital Park and Planning Commission owns and operates the dam. Normal dam operations provide for a half-full stage in the reservoir above the dam. This allows for recreation on Lake Needwood, while maintaining storage capacity for flood control. During heavy rains in June of 2006, the lake level rapidly increased 23 feet. On June 27, dam operators discovered uncontrolled seepage on the downstream slope of the dam and the dam owners initiated the emergency action plan for the dam. At 1:00 AM on June 28, the Montgomery County Emergency Operations Center issued an evacuation order to at-risk residents below the dam. The county completed the evacuation by 8:00 AM the following morning, with 2,400 people evacuated from downstream communities. The evacuation lasted two days. During the evacuation, county managers, Natural Resources Conservation Service personnel, and Maryland Department of the Environment - Dam Safety Division personnel assessed and monitored the seepage. They examined the fractured bedrock below the dam and installed observation wells to determine potential causes of the seepage. After two days, the reservoir stage receded and pressures decreased in the observation wells. Officials then allowed residents to return to their homes. Afterwards, officials instituted continuous monitoring of the dam until completion of a rehabilitation of the dam two years later. The incident at Lake Needwood exemplifies the usefulness of an emergency action plan. The dam owner, designer, regulatory agencies, law enforcement, and emergency action officials worked well together. Despite the leakage, the dam served to attenuate floods downstream. The sponsors continue to operate and maintain the rehabilitated dam and maintain an updated emergency action plan.
机译:位于马里兰州Rockville的北部,Relewwood湖湖位于65英尺高,排水区为12.8平方英里。 1965年由PL-566管理局建造,土壤保护服务(现在自然资源保护服务)协助大坝的规划,设计和建设。大坝提供防洪,沉积物控制和娱乐用途。拥有数百家庭和企业的违规洪水,自然资源保护服务和环境 - 大坝安全部门将大坝作为高灾害潜力进行分类。马里兰州 - 国家首都公园和规划委员会拥有并经营大坝。普通坝操作为大坝上方的水库提供半满阶段。这允许娱乐在湖中伍德,同时保持洪水控制的存储能力。在2006年6月的大雨期间,湖泊水平迅速增加了23英尺。 6月27日,大坝运营商在大坝的下游坡上发现了不受控制的渗漏,大坝所有者发起了大坝的紧急行动计划。 6月28日凌晨1点,蒙哥马利县应急运营中心发布了大坝下方风险居民的疏散令。该县在第二天早上8:00完成了疏散,从下游社区撤离了2,400人。疏散持续了两天。在疏散期间,县经理,自然资源保护服务人员和马里兰州的环境部 - 大坝安全部队人员评估并监测渗流。他们检查了大坝下方的断裂基岩并安装了观察井以确定渗流的潜在原因。两天后,水库阶段的后退和观察孔中的压力下降。然后官员允许居民返回他们的家园。之后,官员在两年后完成了大坝的康复之前,持续监测大坝。 Heedwood湖的事件旨在了解紧急行动计划的有用性。大坝所有者,设计师,监管机构,执法和紧急行动官员在一起工作。尽管存在泄漏,但大坝才能减弱下游洪水。赞助商继续运营和维护康复大坝并维持更新的紧急行动计划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号