COMPREHENSIVE REHABILITATION IMPROVEMENTS AT CEDAR CREEK RESERVOIR DAM AND SPILLWAY

机译:雪松溪水库坝和溢洪道综合康复改进

获取原文

摘要

Tarrant Regional Water District (TRWD) owns and operates Cedar Creek Reservoir in Henderson and Kaufman Counties, Texas. The reservoir is retained by Joe B. Hogsett Dam, with pool levels controlled by radial and bascule spillway gates. This dam is a zoned earthen embankment. During first filling in the 1960s seepage and boils were noted downstream of the embankment. A relief well network was installed to manage the seepage. This relief well network served the project well, but degraded over time and the efficiency of the system diminished to the point that seepage-related issues reappeared. TRWD contracted with Freese and Nichols, Inc. to study the dam and spillway, and to develop and design improvements. A variety of solutions were developed, and several design packages were approved and constructed at the dam and spillway over the course of several years. The primary improvement was the installation of a new relief well network to and restore dam safety. The network include 76 new relief wells and collecting piping with stainless steel well screens and risers, a two-stage seepage collection toe drain that parallels the well collection piping, two pump stations, new instrumentation, grouting of upstream rip rap, a shallow slide repair, a 1,400-linear-foot grout curtain to close cutoff windows, and a left abutment seepage collection trench. The design allows for the reclamation of the collected water and provides innovative solutions for access and maintenance of the network. This new network increases dam safety by being more robust than the older network, and easier to access and maintain. It also has the benefit of improving access to downstream areas for both inspection and emergency operations. Since completion, the project has seen a significant improvement in piezometric levels across the site and access conditions in the downstream field are markedly improved.
机译:塔特兰地区水区(TRWD)拥有并在德克萨斯州亨德森和考夫曼县的Cedar Creek Chockoir。 joe b. hogsett大坝保留了水库,由径向和尖端溢洪道栅极控制的游泳池水平。这座大坝是一个分区的土地堤。在1960年代的首次填充过程中,渗漏的渗漏并沸腾在堤防下游。安装了一个浮雕井网络来管理渗漏。这种救济井网提供了良好的项目,但随着时间的推移,减少了系统的效率,以渗流有关的问题再次出现。 TRWD与Freese和Nichols,Inc。学习大坝和溢洪道,并开发和设计改进。开发了各种解决方案,在多年的过程中批准并在大坝和溢洪道上批准并构建了几种设计套餐。主要改进是安装新的救济井网络和恢复大坝安全。网络包括76个新型浮雕井和带有不锈钢井口和立管的管道,这是一个两级渗流收集脚趾排水,使得井收集管道,两个泵站,新仪器,上游撕裂RAP的灌浆,浅幻灯片修复,一个1,400线性脚灌浆窗帘关闭截止窗,左基台渗漏收集沟槽。该设计允许填建收集的水,并为网络的访问和维护提供创新解决方案。这个新的网络通过比旧网络更强大地增加了大坝安全性,更容易访问和维护。它还有利于改善对检查和紧急操作的下游领域的访问。完成以来,该项目已经看到,在网站上的压力水平的显着改善,下游场中的接入条件明显改善。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号