首页> 外文会议>Rapid Excavation and Tunneling Conference >SEM Tunnel Herrschaftsbuck: A Geological Challenge in Germany's Southwest
【24h】

SEM Tunnel Herrschaftsbuck: A Geological Challenge in Germany's Southwest

机译:SEM Tunnel Herrschaftsbuck:德国西南地质挑战

获取原文

摘要

The Herrschaftsbucktunnel is located near the city of Rheinfelden (Germany) close to the swiss border. This highway tunneling project with two tunnels and a length of approximately 480 meters is excavated by applying the new Austrian tunneling method (NATM). Due to the geological situation and a cross section of 160 m~2 in the southern tunnel, it was required to make use of a complex exploratory drilling program.The paper describes the challenges of constructing this NATM Tunnel in difficult geological conditions, low overburden and big cross sections.
机译:HerrschaftsbuckTunnel靠近莱茵菲尔登(德国)靠近瑞士边境的城市。通过应用新的奥地利隧道法(NATM),这种公路隧道工程有两个隧道和长约480米的长度。由于地质情况和南部隧道160米〜2的横截面,需要使用复杂的探索性钻探计划。本文描述了在困难地质条件下构建该NATM隧道的挑战,低铁大横截面。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号