首页> 外文会议>Rapid Excavation and Tunneling Conference >Construction Logistics for East Side Access CM006 Manhattan North Structures-A Study from Queens to Manhattan
【24h】

Construction Logistics for East Side Access CM006 Manhattan North Structures-A Study from Queens to Manhattan

机译:East Side Access CM006曼哈顿北方结构的建筑物流 - 从曼哈顿的Queens学习

获取原文

摘要

This paper describes the logistical challenges that were encountered during the construction of East Side Access (ESA) CM006 (Manhattan North Structures). While the daily logistics of transporting materials, personnel and concrete throughout the construction site may seem mundane (given the sheer enormity of ESA), this is a critical operation that directly impacts the project schedule. Coordinating the delivery of the necessary materials is a complex endeavor, given the high demand, the dense urban setting and the large geographical scope of the project. The specific delivery system for concrete and other materials to the tunnel site will be discussed in detail in this paper.
机译:本文介绍了东侧访问(ESA)CM006(曼哈顿北结构)在建造期间遇到的后勤挑战。虽然在整个施工现场运输材料,人员和混凝土的日常物流可能看起来似乎是平凡的(鉴于ESA的纯粹巨大),这是一个直接影响项目时间表的关键操作。协调必要材料的交付是一种复杂的努力,鉴于高需求,密集的城市环境和项目的大地理范围。本文将详细讨论用于隧道部位的混凝土和其他材料的具体输送系统。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号