首页> 外文会议>Rapid Excavation and Tunneling Conference >Long-Distance Microtunnelling at Toronto Pearson International Airport
【24h】

Long-Distance Microtunnelling at Toronto Pearson International Airport

机译:在多伦多皮尔逊国际机场的长途微量箱

获取原文

摘要

Identified as the last link in the twinning of Peel Region's East Trunk Sewer, the Etobicoke Creek Trunk Sanitary Sewer Twinning project was initiated to service future development in the sewershed. The project involved long-distance microtunnelling below operating surfaces that included a runway, two taxiways and access roadways at Canada's busiest airport, Toronto Pearson International Airport (TPIA). This paper discusses the challenges overcome in completing this project including working within TPIA's restricted "airside" environment, long-distance pipe jacking in mixed-ground conditions, providing for tunnel face access under hyperbaric conditions and minimizing tunnelling impacts to airport operations during construction.
机译:被确定为果岭区东干下水道孪晶的最后一个环节,etobicokeCreek Trunk卫生下水道Twinning项目被启动,以便在下水道中使用未来的发展。该项目涉及下面的经营表面下方的远程微管,其中包括跑道,两条滑行道和加拿大最繁忙的机场,多伦多皮尔逊国际机场(TPIA)。本文讨论了完成该项目的挑战,包括在TPIA的受限制的“空间”环境中工作,在混合地条件下的长途管道上,在高压条件下提供隧道面前,并在施工期间将隧道冲击最小化到机场运营。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号