Diglndy Tunnel System-Pleasant Run Deep Tunnel Optimization Yields Cost Savings and Improved Level of Service

机译:Diglndy Tunnel System-Sulsant Run Deep Tunnel优化产生成本节约和改进的服务水平

获取原文

摘要

The Pleasant Run Deep Tunnel is a 39,900-foot long component of the 28-mile long Diglndy deep rock tunnel system, the cornerstone of Citizens Energy Group's Long Term Control Plan (LTCP). Final planning optimized the conceptual design to achieve CSO capture objectives while eliminating expensive components and saving millions of dollars. The capacity of existing infrastructure was optimized by raising or adding weirs instead of installing new diversion structures and consolidation sewers. The number and length of required adits were minimized by optimization of the tunnel alignment and selection of drop shaft locations closer to the alignment. Several drop shafts originally planned were also eliminated. The overall level of control is expected to exceed LTCP requirements.
机译:令人愉快的水深隧道是28英里长的Diglndy深岩隧道系统的39,900英尺长的部件,是公民能源集团长期控制计划(LTCP)的基石。最终规划优化了概念设计,以实现CSO捕获目标,同时消除昂贵的组件并节省数百万美元。通过培养或添加堰而不是安装新的转移结构和整合下水道,优化现有基础设施的能力。通过优化隧道对准并选择更靠近对准的掉轴位置的选择,最小化所需坯料的数量和长度。还消除了最初计划的几个落叶轴。预计总体控制水平将超过LTCP要求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号