首页> 外文会议>Rapid Excavation and Tunneling Conference >DEVELOPMENT OF STEEL-FIBER REINFORCED HIGH FLUIDITY CONCRETE SEGMENT AND APPLICATION TO CONSTRUCTION
【24h】

DEVELOPMENT OF STEEL-FIBER REINFORCED HIGH FLUIDITY CONCRETE SEGMENT AND APPLICATION TO CONSTRUCTION

机译:钢纤维增强高流动性混凝土段的开发及施工应用

获取原文

摘要

The Metropolitan Expressway Central Circular Route with a total length of approximately 47 km is located outside the Inner Circular Route of Tokyo (at a radius of approximately 8 km from the city center). Sections with a length of approximately 26 km, slightly less than 60 percent of the total length, on the east and north sides are in service. Completing the Central Circular Route (Figure 1) is expected to enable through traffic concentrated at the city center to get around, and to form a well balanced transport network, which will alleviate traffic congestion considerably. The Central Circular Shinjuku Route, a section with a length of approximately 11 km on the west side, is now being constructed at a fast pace. The route is being built mainly by the shield tunneling method to carry out work smoothly under a trunk highway carrying heavy traffic and to reduce adverse effects of tunneling work on residents in the neighborhood.
机译:总长度约47公里的大都市高速公路中央圆形路线位于东京内部圆形路线(距离市中心约8公里的半径)之外。在东部和北侧的总长度约26公里的部分略小于60%,略低于总长度的60%。完成中央圆形路线(图1)预计将通过集中在市中心的交通来实现,并形成一个良好的平衡运输网络,这将大大减轻交通拥堵。中央圆形新宿路线,西侧长度约11公里的部分,现在正在以快速的速度建造。该路线主要由盾构隧道方法建造,在携带繁忙的行李箱高速公路下平稳地进行工作,并降低隧道隧道工作对邻居居民的不利影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号