On Tuen Mun Chek Lap Kok Link subsea tunnels project, the difficult ground conditions as well as the tunnel depth reaching almost 60 m made the tunneling works particularly challenging. Numerous innovative technologies and methodologies were thoroughly developed and implemented in order to overcome these challenges and to make the TBM drives a success. Two 14 m diameter TBMs were used along the 4.5 km long drive below the sea. One of them had started its drive with the world's largest diameter (17.63 m) along the first 630 m before being reconfigured into a 14 m diameter TBM. For hyperbaric maintenance interventions, saturation diving i system and full automatic robotic arms were developed to change a total of about 2000 disc-cutters on both TBM cut-terheads. Another major challenge was the construction of 41 subsea cross passages for which the pipe jacking methodology was adapted for the project. Apart from TBM drives, innovative design solutions were developed for the construction of Shafts, their crossing with TBMs and Cut and Cover sections including a 500 m-long and 43 m-deep Caterpillar- Figure 1. Tuen Mun shaped cofferdam with 15 cells.
机译:在屯门Chek Lap Kok Link Hell Link Subnels项目,艰难的地面条件以及隧道深度达到近60米的隧道深度使隧道效果特别具有挑战性。彻底发展和实施了许多创新技术和方法,以克服这些挑战,并使TBM推动成功。在海底下方4.5 km长的4.5 km长的驱动器中使用了两种14米的TBM。在重新配置为14米的TBM之前,其中一人沿着前630米沿着世界上最大直径(17.63米)的驱动器开始。对于高压维护干预,开发了饱和潜水I系统和全自动机器人臂,在两次TBM切割头上改变约2000个磁盘切割器。另一个主要挑战是建设41个海底跨通道,其中管道偏移方法适用于该项目。除了TBM驱动器外,开发了创新的设计解决方案,用于轴的施工,与TBMS和切割和覆盖部分,包括500米长和43平方米的毛虫 - 图1.屯门围堰,15个细胞。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号