Closing the Gap for Bogota River Sanitation System Tunnels (Colombia)

机译:关闭波哥大河卫生系统隧道(哥伦比亚)的差距

获取原文

摘要

Located within challenging terrain, the Interceptor Tunjuelo-Canoas (ITC) (4.2 m) and 0the Emergency (3.2 m) tunnels form 11 km of underground conduits of the Bogota River sanitation system. Vertically offset, the tunnels were to be connected via a pump station; logistical and contractual challenges resulted in a two-year construction delay. CDM Smith, subsequently retained by the owner, Empresa de Acueducto de Bogota (Owner), designed the interconnection as a vortex drop-shaft structure. This paper documents project and geotechnical synopsis; novel approach to vortex chamber construction through layered claystone and sandstone geology, without utilizing working shafts; and, modifications to the segmentally lined tunnels.
机译:位于充满挑战的地形内,拦截器屯朱梅拉 - 甘肃(ITC)(4.2米)和0突出(3.2米)隧道组成11公里的波哥大河卫生系统。垂直偏移,隧道将通过泵站连接;后勤和合同挑战导致了两年的建设延误。 CDM史密斯,随后由业主保留,EMPRESA DE ACUQUENTO DE BOGOTA(所有者)设计为涡流滴轴结构的互连。本文文件项目和岩土工程概要;通过层叠砂岩和砂岩地质的涡流室建设的新方法,不利用工作轴;并且,对分段衬里的隧道进行修改。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号