首页> 外文会议>Rapid Excavation and Tunneling Conference >Grouting and Ground Modification-Copenhagen Cityringen Project: Compensation and Jet Grouting as Mitigation Measures for TBM Operation Under Historical Building
【24h】

Grouting and Ground Modification-Copenhagen Cityringen Project: Compensation and Jet Grouting as Mitigation Measures for TBM Operation Under Historical Building

机译:灌浆和地面改性 - 哥本哈根魁梧的项目:历史建设下TBM运作的减缓措施补偿及喷射灌浆

获取原文

摘要

The Cityringen project will form a new circular line in the city centre and will consist of 21 new stations (17 + 4 transfer station) and approx. 31 Km of EPB twin-bored tunnels.The new tunnels passed under the historical building of Magasin du Nord, McDonald's and two pubs in the heart of the city with a minimum cover of about 4 m.To minimize the movements, a complex system of compensation grouting and jet grouting soil treatment was performed. A detailed action plan between the parties involved allowed coping with the critical TBMs passage successfully.
机译:Cityringen项目将在市中心形成一个新的圆形线,将包括21个新站(17 + 4个转移站)和约。 31公里的EPB双钻孔隧道。新的隧道在Magasin du Nord,麦克唐纳和城市中心的历史建筑下通过了大约4米的最低掩护。尽量减少动作,复杂的系统进行补偿灌浆和喷射灌浆土壤处理。各方之间的详细行动计划允许成功应对关键的TBMS段落。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号