KARAHNJUKAR HYDROELECTRIC PROJECT, ICELAND EXTREME UNDERGROUND CONSTRUCTION

机译:Kaharnajkar水电项目,冰岛极端地下建设

获取原文

摘要

Landsvirkjun-the national electric power company of Iceland-is building the Karahnjukar Hydroelectric Project in eastern Iceland. Two glacial river systems will be dammed and channeled through a series of tunnels into a 690 MW underground powerhouse. The Project has a total of 73 km of tunnels to be excavated of which most have been completed. From three access adits, three large diameter (7.2 m to 7.6 m), main-beam, gripper-type, Tunnel Boring Machines (TBMs) are being used to complete 50-km of the waterway tunnel. Using the TBMs was a first in Iceland to excavate the complex Icelandic basalt formations, which consist of inclined layers of hard basaltic flows with weaker scoriaceous and sedimentary interbeds. Faults, fissures and dykes that frequently cross the lava flows posed both geologic and hydrogeologic difficulties to the TBM tunneling. This paper describes the extreme challenges that the men and equipment had to endure to complete the tunneling, including the harsh winter weather on the surface and the cold, abundant ground water inflows within the tunnels.
机译:Landsvirkjun--冰岛国家电力公司 - 正在冰岛东部建造Karahnjukar水电项目。两个冰川河流系统将通过一系列隧道批量危机,进入690 MW地下厂房。该项目共有73公里的隧道挖掘,其中大部分都已完成。从三个接入配合,三个大直径(7.2米至7.6米),主束,夹具型,隧道镗床(TBMS)都用于完成50公里的水路隧道。使用TBMS是冰岛的第一个,挖掘复杂的冰岛玄武岩形成,该玄武岩玄武岩形成包括倾斜层的硬质玄武岩流量,具有较弱的微肠和沉积架构。经常穿过熔岩流的缺陷,裂缝和堤坝向TBM隧道带来了地质和水文地质困难。本文介绍了男人和设备必须忍受完成隧道的极端挑战,包括隧道内表面和寒冷的冬季天气,隧道内的寒冷地下水流入。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号