TUNNELING UNDER GLACIERS GALORE CREEK MINE ACCESS TUNNEL, BC, CANADA

机译:隧道冰川下的Galacer Creek Cine Access Tunnel,BC,加拿大

获取原文

摘要

The Galore Creek Mine project is one of the newest major mining projects under development in Canada. The project is located in a very remote area of northwestern British Columbia and is being developed by NovaGold Resources of Vancouver. The mine project comprises one of the largest and highest grade undeveloped porphyryrelated gold-silver-copper deposits in North America. In order to access the mine site a new 120 km road is planned to be constructed including a 4.4 km mine access road tunnel. Glaciers with heavy snow pack cover approximately two-thirds of the tunnel alignment with a maximum cover of 1,200 m. The size of the access road tunnel is about 50 m2 and has been designed as a large single lane road tunnel to accommodate the transport of large size mining equipment for mine start up and ongoing operations. The rock conditions along the tunnel alignment comprise very strong volcanic rocks. Key services for mining operations will be incorporated into the tunnel comprising diesel and power as well as the concentrate pipeline. Structural portal canopies have been incorporated into the tunnel design due to the risk of rockfalls and avalanches in the portal areas. The mine access road tunnel is a significant and criticalpath component to the overall project to provide vehicular access to allow construction of the mine site. In order to meet the expected mine start up date the construction of the tunnel works are to commence prior to any other works at the mine site and will be constructed entirely by helicopter support. Geotechnical investigations commenced in the summer of 2006 with the removal of the overburden materials at the portals to assess bedrock conditions. Tunnel construction from both portals is expected to commence in the spring of 2007. The construction of the mine project is subject to and awaiting environmental approval in the spring of 2007. The mine access road tunnel will be the longest private road tunnel in North America. The key design and constructability issues for the mine access road tunnel project are presented and discussed.
机译:Galore Creek矿山项目是加拿大开发的最新矿业项目之一。该项目位于不列颠哥伦比亚省西北部的一个非常偏远的地区,是由温哥华的诺贝尔德资源开发的。矿井项目包括北美最大,最高级未开发的斑纹金银铜矿之一。为了访问矿场,计划建造一个新的120公里道路,包括4.4公里的矿山通道隧道。带有大量雪包的冰川覆盖大约三分之二的隧道对准,最大盖子为1,200米。通路隧道的大小约为50平方米,设计为一个大型单车道公路隧道,以适应矿井启动和持续运营的大型采矿设备的运输。沿着隧道对准的岩石条件包括非常强烈的火山岩。采矿业务的关键服务将被纳入包括柴油和电力以及集中管道的隧道。由于门户网站地区的落地和雪崩的风险,结构门户檐篷已被纳入隧道设计。矿井通道隧道是整体项目的重要和关键路径组件,以提供车辆进入以允许矿山的建设。为了满足预期的矿山启动日期,隧道工程的建设是在矿场的任何其他作品之前开始,并将完全由直升机支持构建。在2006年夏天开始岩土工程调查随着门户网站的覆盖物材料而开始评估基岩条件。预计这两个门户网站的隧道建设将在2007年春天开始。矿井项目的建设受到2007年春季的环境批准。矿山通道将成为北美最长的私人道路隧道。介绍和讨论了矿山通路隧道项目的关键设计和结构问题。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号