首页> 外文会议>Rapid Excavation and Tunneling Conference >SUPPORT OF THE LEIPZIG CITY-TUNNEL EXTENSION USING A TIE-BACK SUPPORTED FREEZE WALL
【24h】

SUPPORT OF THE LEIPZIG CITY-TUNNEL EXTENSION USING A TIE-BACK SUPPORTED FREEZE WALL

机译:使用连接支撑的冻结墙的莱比锡城市隧道延伸的支持

获取原文

摘要

The extension of the commuter railway system (S-Bahn) in Leipzig, Germany will require the construction of an under-ground line crossing the downtown area of the city to tie the Bavarian Station in the South to the Main-Station in the North. The City-Tunnel-Leipzig is currently one of the largest infrastructure projects in Europe. This system extension will have a length of approximately five kilometers. 3.9 kilometers of that length are currently being constructed using either cut & cover construction or tunneling methods. The design and construction of this project currently is and will continue facing very significant challenging urban and demanding geotechnical conditions.
机译:德国莱比锡通勤铁路系统(S-BAHN)的延伸将要求建造一个地下线,穿过城市市中心的地区,将南方的巴伐利亚站系在北部的主站。 City-Tunnel-Leipzig目前是欧洲最大的基础设施项目之一。该系统扩展长度约为5公里。目前正在使用切割和覆盖结构或隧道方法建造3.9公里。目前该项目的设计和建设是,并将继续面临非常重要的城市和苛刻的岩土工程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号