This paper discusses the challenges to complete the construction of two large underground Metro stations and connecting tunnels in the Tren Urbano system. The completion work includes the installation of specialized mechanical and electrical systems, extensive architectural finishing as well as coordination with systemwide power and controls installed by others. A unique feature of this project was the simultaneous design and construction of the structural/civil/architectural/mechanical/ electrical works by KKZ separately from the power and control systems under the management of the Owner, its consultants and other contractors. Completion of this project comes after almost six years of continuous design and construction in a dense urban environment. The project was confronted by many challenges that could only be met with the combined efforts of the Joint Venture team in close cooperation with the Owner and its Systemwide Contractor. This paper will also address many of the major design and construction changes implemented to suit the Owner's requirements.