COMPLETION OF THE CONSTRUCTION OF TWO LARGE UNDERGROUND STATIONS AND CONNECTING TUNNELS ON A LUMP SUM DESIGN-BUILD CONTRACT

机译:完成两个大型地铁站的建设,并在一次性设计 - 建立合同上连接隧道

获取原文

摘要

This paper discusses the challenges to complete the construction of two large underground Metro stations and connecting tunnels in the Tren Urbano system. The completion work includes the installation of specialized mechanical and electrical systems, extensive architectural finishing as well as coordination with systemwide power and controls installed by others. A unique feature of this project was the simultaneous design and construction of the structural/civil/architectural/mechanical/ electrical works by KKZ separately from the power and control systems under the management of the Owner, its consultants and other contractors. Completion of this project comes after almost six years of continuous design and construction in a dense urban environment. The project was confronted by many challenges that could only be met with the combined efforts of the Joint Venture team in close cooperation with the Owner and its Systemwide Contractor. This paper will also address many of the major design and construction changes implemented to suit the Owner's requirements.
机译:本文讨论了完成两个大型地铁地铁站建设的挑战,并在Tren Urbano系统中连接隧道。完成工作包括安装专门的机械和电气系统,广泛的建筑精加工以及与其他人安装的系统版电源和控制的协调。该项目的独特功能是通过在业主,顾问和其他承包商的管理层下的电力和控制系统分开与KKZ的结构/民用/建筑/机械/电气工程的同时设计和构造。完成该项目的完成后近六年的封闭城市环境中的持续设计和建设。该项目面临着许多挑战,只有可以与合营团队与所有者及其系统的承包商密切合作的合作努力。本文还将满足以适合所有者要求所实施的许多主要设计和施工变更。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号