首页> 外文会议>Rapid Excavation and Tunneling Conference >LAKE MATHEWS OUTLET FACILITIES' SHAFT CONSTRUCTION, METROPOLITIAN WATER DISTRICT OF SOUTHERN CALIFORNIA
【24h】

LAKE MATHEWS OUTLET FACILITIES' SHAFT CONSTRUCTION, METROPOLITIAN WATER DISTRICT OF SOUTHERN CALIFORNIA

机译:Mathews Outlet Explet Ellications's Shaft Construction,南加州大都市水域

获取原文

摘要

The Metropolitan Water District of Southern California has undertaken the Lake Mathews Outlet Facilities project to replace the existing outlet facilities. In the late 1990s, consulting engineers for the District determined that the Lake Mathews Outlet Facilities were susceptible to a catastrophic failure during a seismic event. To ensure a reliable supply of water to Metropolitan's customers in the Los Angeles area, the District decided to construct new outlet facilities. This Project consists of excavating a large diameter junction shaft, a 6.10 m (20 ft.) horseshoe tunnel, three short 4.88 m (16 ft.) horseshoe bypass tunnels, and a large excavation within a cofferdam that were all driven in difficult rock conditions. Additionally, a new concrete outlet tower was constructed and connected to the existing tunnel by the new bypass tunnels and through the junction shaft. The J.F. Shea Co., Inc. of Walnut, California, is currently finishing the construction of the Lake Mathews Outlet Facilities Project for Metropolitan. The large diameter junction shaft is 50.60 m (166 ft.) deep, excavated 16.15 m (52 ft.) in diameter and lined with a 61 cm (2'-0") thick steel reinforced concrete lining to a finished diameter of 14.63 m (48 ft.). The shaft was excavated full face with one stationary shaft three-boom jumbo, modified for the large diameter. The shaft also consists of four sets of gate guides extruding from the shaft wall towards the center of the shaft that provide the ability to operate up to four mechanical gates at any time, to open or close each tunnel. This paper will present the junction shaft excavation and concrete construction techniques, including the innovative slip form method utilized to construct the junction shaft.
机译:南加州大都市水域已经开展了Mathews Outlet设施项目,以取代现有的出口设施。在20世纪90年代末,该区的咨询工程师确定了Mathews湖的出口设施在地震事件中易受灾难性失败的影响。为确保在洛杉矶地区的大都市客户提供可靠的水供应,该区决定建造新的出口设施。该项目包括挖掘大直径的连接轴,6.10米(20英尺)的马蹄隧道,三个短4.88米(16英尺)的马蹄旁路隧道,以及在困难的岩石条件下驾驶的围堰内的大挖掘。另外,通过新的旁路隧道和接合轴构造并连接到现有隧道的新混凝土出口塔。加利福尼亚州核桃的J.f. Shea Co.,Inc。目前正在完成大都市湖的湖门湖网站设施。大直径的连接轴为50.60米(166英尺)深,直径为16.15米(52英尺),衬里61厘米(2'-0“)厚钢筋混凝土衬里,成品直径为14.63米(48英尺)。轴挖出全面,一个固定轴三臂伸部,用于大直径。轴还包括四组栅极导轨,从轴壁朝向提供的轴的中心挤出随时运行最多四个机械闸门,打开或关闭每个隧道。本文将介绍结轴挖掘和混凝土施工技术,包括用于构造连接轴的创新滑动形式方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号