首页> 外文会议>Rapid Excavation and Tunneling Conference >DESIGN AND CONSTRUCTION LOGISTICS FOR THE UNDERGROUND LABORATORY AT CERN, SWITZERLAND
【24h】

DESIGN AND CONSTRUCTION LOGISTICS FOR THE UNDERGROUND LABORATORY AT CERN, SWITZERLAND

机译:瑞士CERN地下实验室的设计与建筑物流

获取原文

摘要

In 1996 a KBR (Brown and Root) led international JV was appointed to design and supervise an underground and surface package. The design of 6 km of tunnels, plus enlargements, deep shafts in glacial and sandstone deposits for the conversion of the existing LEP underground laboratory at CERN, Geneva adjacent to the Jura Mountains/ Lake Geneva had to be undertaken in an operational environment and in conjunction with other underground constructions associated with the 3bn US dollars refurbishment.
机译:1996年,KBR(棕色和根)LED国际JV被任命为设计和监督地下和地表包。隧道6公里的设计,加上冰川地下实验室的冰川地下实验室的冰川和砂岩沉积物的深度,日内瓦毗邻汝拉山脉/日内瓦湖的日内瓦必须在运营环境和结合中进行与其他与3亿美元翻新相关的地下建筑。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号