首页> 外文会议>International conference on hydropower >Invited Paper: Shihlin hydropower development project in Taiwan
【24h】

Invited Paper: Shihlin hydropower development project in Taiwan

机译:邀请论文:台湾石林水电开发项目

获取原文

摘要

For the Shihlin project, new construction methods will be applied for construction of the power tunnel and shafts. These include the TBM method, raise-boring method, telescoping form, etc. In addition, the dam will be built on the alluvium deposit layer with a depth as deep as 44 m. The design and construction of the project are involved in a certain degree of technical difficulties, which call for carefully studies and evaluation.
机译:对于史丽林项目,将应用新的施工方法来构建电源隧道和轴。这些包括TBM方法,升高钻孔方法,伸缩形式等。此外,该坝将由深度深度为44米的深度构建大坝。该项目的设计和构造涉及一定程度的技术困难,呼吁仔细研究和评估。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号