首页> 外文会议> >Optimization of material consumption at the extrusion of medium, high and extra high voltage cables in CV-lines
【24h】

Optimization of material consumption at the extrusion of medium, high and extra high voltage cables in CV-lines

机译:优化在CV线中挤压中,高和超高压电缆时的材料消耗

获取原文
获取原文并翻译 | 示例

摘要

X-ray measurement, performed directly after the crosshead, combined with a control system-which gets its information directly out of the scan data-reduces material consumption to a minimum. A generally too strong wall thickness, chosen as a precaution, and CV line start-up scrap things of the past. Based on the above mentioned aspects, the author presents the possibility of simultaneous measurement of all three layers of medium and high voltage cables.
机译:在十字头之后直接进行X射线测量,并与控制系统结合使用,该控制系统直接从扫描数据中获取其信息,从而将材料消耗降至最低。通常将其壁厚设置得过大(以防万一),并且开始使用CV生产线将过去的事情报废。基于上述方面,作者提出了同时测量中高压电缆的所有三层的可能性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号