首页> 外文会议>Association International, Inc. annual convention >Optimization of material consumption at the extrusion of medium, high and extra high voltage cables in CV-lines
【24h】

Optimization of material consumption at the extrusion of medium, high and extra high voltage cables in CV-lines

机译:在CV线中挤出介质,高压电缆挤出材料消耗的优化

获取原文

摘要

X-ray measurement, performed directly after the crosshead, combined with a control system-which gets its information directly out of the scan data-reduces material consumption to a minimum. A generally too strong wall thickness, chosen as a precaution, and CV line start-up scrap things of the past. Based on the above mentioned aspects, the author presents the possibility of simultaneous measurement of all three layers of medium and high voltage cables.
机译:X射线测量,直接在十字头之后执行,与控制系统结合 - 这将其信息直接从扫描数据中直接从扫描数据中降低到最小值。一般过于强大的壁厚,被选为预防措施,以及过去的CV线启动废料。基于上述方面,作者介绍了同时测量所有三层介质和高压电缆的可能性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号