PLANNING AND DESIGN OF BRIDGES IN URBAN ENVIRONMENTS: A CASE STUDY OF THE WEST PARKCENTER BRIDGE, BOISE, IDAHO

机译:城市环境中桥梁的规划和设计:以爱达荷州博伊西市西公园中心桥梁为例

获取原文
获取原文并翻译 | 示例

摘要

The major issue with the planning and design was educating the public about the need for the project. Prior to the far-reaching public involvement program and educational efforts, many local residents and business-owners believed that creating a new route and bridge would increase area traffic. Through the many public meetings and informational letters, we were able to prove to them that in reality the traffic would be eased, and that this solution was designed with the forethought that would accommodate the area's future growth. Another major issue was preparing the environmental documents. The rules are not well understood. The information available for preparing a US Army Corps of Engineers 404 permit is geared for permits that are simple and straightforward, such as a nation wide permit. Once it was determined that this project would require an individual permit, the rules and requirements expanded. Designers need to be aware of these requirements and be prepared to spend a lot of time preparing the permits. A major issue with construction was the erection of the beams and adequate space for access and construction equipment. At the pre-construction meeting it should be emphasized that an erection plan needs to be submitted early and there shall be strict adherence to the permits. Before construction starts the wetland boundaries should be staked, well-marked and a walkthrough completed with the agencies and the contractor present. If the space is not adequate then discussions should begin on modifying the permit. The contractor needs to have an erection plan complete and approved before applying for the modified permit.
机译:规划和设计的主要问题是向公众宣传该项目的需求。在进行广泛的公众参与计划和开展教育工作之前,许多当地居民和企业主认为,建立新的路线和桥梁将增加地区交通量。通过多次公开会议和通报信,我们能够向他们证明,实际上交通将得到缓解,并且该解决方案的设计具有预见性,将适应该地区的未来发展。另一个主要问题是准备环境文件。规则了解得不多。可用于准备美国陆军工程兵404许可证的信息适用于简单明了的许可证,例如全国范围的许可证。一旦确定该项目需要个人许可,规则和要求就会扩展。设计师需要意识到这些要求,并准备花费大量时间准备许可证。施工中的一个主要问题是梁的架设以及足够的空间用于通道和施工设备。在施工前会议上应强调的是,必须尽早提交安装计划,并且必须严格遵守许可证。在施工开始之前,应对湿地边界进行放样,标记清楚,并在相关机构和承包商在场的情况下完成演练。如果空间不足,则应讨论修改许可证。承包商在申请修改后的许可证之前,必须先完成安装计划并获得批准。

著录项

  • 来源
    《》|2001年|p.208-219|共12页
  • 会议地点 Coeur DAlene ID(US);Coeur DAlene ID(US)
  • 作者

    Joseph Keller;

  • 作者单位

    Structural Engineering, WH Pacific;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng